| Turnkey Project | Yes |
|---|---|
| Turkkey Project | Provided |
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Type | Polyurethane Foam Machine |
| Coatingtype | 3-Layer Polyethylene (3LPE) |
|---|---|
| Usage | Making 3lpe Coating Pipe |
| Coating Layers | 3 Layers (FBE+Adhesive+Polyethylene) |
| Insulationmaterial | Polyurethane (PU) Foam |
| Velocity | 1 To 6 Meter Per Minutes |
| Usage | Gas / Water Supply Pipe |
|---|---|
| Extrusion Capacity | 1000 (Kg/H) |
| Pipe Diameter | 20-2200mm |
| Calibration Method | Vacuum |
| Delivery Time | 90days |
| Warranty | 12 Months |
|---|---|
| Product Type | PE Pipe |
| Screw No. | Single Screw |
| Automation | Automatic |
| Computerized | Computerized |
| Warranty | 12 Months |
|---|---|
| Product Type | PE Pipe |
| Screw No. | Single Screw |
| Automation | Automatic |
| Computerized | Computerized |
| Screw No. | Single-screw |
|---|---|
| Raw Material | Pe |
| HDPE Jacket Pipe Color | Can Be Customized |
| Application | Producing Pre-Insulated Pipe |
| Packaging Details | standard packaged |
| Heat Resistance | Normal Temperature |
|---|---|
| Base Material | PE |
| Application | Pipeline Field Joint Protection |
| Trademark | Huashida |
| Transport Package | Standard Package |
| Customized | Customized |
|---|---|
| Application | Plastic, Metal, HDPE Pipeline Joint |
| Material | LDPE |
| Feature | Insulation |
| Corrosion Rate | 0.01-0.1 |
| Structure | PE Backing+Adhesive |
|---|---|
| Base Material | PE |
| Size | Customized |
| Application | Pipeline Field Joint Protection |
| Heat Resistance | Normal Temperature |
| Production Capacity | 5tons/Day |
|---|---|
| Heat Resistance | Normal Temperature |
| Trademark | Huashida |
| Application | Pipeline Field Joint Protection |
| Structure | PE Backing+Adhesive |