| Application | Pipe Production |
|---|---|
| Material | Steel |
| Insulation Material | Polyurethane Foam |
| Control System | PLC Control |
| Max. Working Pressure | 2.5MPa |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 100set a year |
| Place of Origin | china |
| Capability | 3-4unit/H |
|---|---|
| Foaming Thickness | 30-100mm |
| Cleaning Level | SA2.5 |
| Packaging Details | standard Package |
| Delivery Time | 60DAYS |
| Cleaning Level | SA2.5 |
|---|---|
| Types | Polyurethane Foam Machine |
| Raw Material | PE |
| Automation | Automatic |
| Packaging Details | standard Package |
| Type | Polyurethane Foam Machine |
|---|---|
| Principle | High-Pressure Air Type |
| Used Material | ISO , Poly ,PE |
| Packaging Details | Standard Package for Export |
| Delivery Time | 60DAYS |
| Capacity (kg/h) | 600kg/h |
|---|---|
| Certification | CE, ISO9001:2008 |
| Condition | New |
| Pipe Material | PE, HDPE |
| Applicable Tube's Diameter | 110-560 |
| Pipe Jacking Machine | Integrated And Adjustable |
|---|---|
| Specification | ISO9001: 2008 |
| Calibration Method | Vacuum Calibration |
| Computerized | Computerized |
| Screw No. | Single-screw |
| Packaging Details | wodden box |
|---|---|
| Delivery Time | 70-90 days |
| Payment Terms | L/C,T/T |
| Supply Ability | 50 sets / Year |
| Place of Origin | Huashida |
| Coating | Powder Coating |
|---|---|
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Principle | High-Pressure Air Type |
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Packaging Details | Wodden Box |
| Pipe Jacking Machine | Integrated And Adjustable |
|---|---|
| Specification | ISO9001: 2008 |
| Calibration Method | Vacuum Calibration |
| Computerized | Computerized |
| Screw No. | Single-screw |