| Application | Pipe Production |
|---|---|
| Material | Steel |
| Insulation Material | Polyurethane Foam |
| Control System | PLC Control |
| Max. Working Pressure | 2.5MPa |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 100set a year |
| Place of Origin | china |
| Capability | 3-4unit/H |
|---|---|
| Foaming Thickness | 30-100mm |
| Cleaning Level | SA2.5 |
| Packaging Details | standard Package |
| Delivery Time | 60DAYS |
| Cleaning Level | SA2.5 |
|---|---|
| Types | Polyurethane Foam Machine |
| Raw Material | PE |
| Automation | Automatic |
| Packaging Details | standard Package |
| Type | Polyurethane Foam Machine |
|---|---|
| Principle | High-Pressure Air Type |
| Used Material | ISO , Poly ,PE |
| Packaging Details | Standard Package for Export |
| Delivery Time | 60DAYS |
| Medium Temperature | ≤120°C (incidental Peak Value <140°C) |
|---|---|
| Inner Pipe Material | PE |
| Foamingmethod | High-pressure Foaming |
| Customized | Customized |
| HS Code | 8477209000 |
| Material | PU & PE |
|---|---|
| PU Thickness | 30 - 100 Mm |
| PE Thickness | 4 - 10 Mm |
| Capacity | 1500 Kg |
| Specification | 508 - 1520 Mm |
| Turnkey Project | Yes |
|---|---|
| Turkkey Project | Provided |
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Type | Polyurethane Foam Machine |
| Packaging Details | Standard Package |
|---|---|
| Delivery Time | 60 days |
| Payment Terms | L/C,D/A,D/P,T/T,Western Union |
| Supply Ability | 30 set/year |
| Place of Origin | Qingdao,China |
| Features | Continuous Production, Simultaneous Molding. |
|---|---|
| Color | Any |
| Production | Can Be Produced Continuously For 24 Hours. |
| Capacity | ≤ 250 M2/H |
| Specification | 26 - 315 Mm |