| Working Principle | High-Pressure Air Type |
|---|---|
| Control Mode | Computerized |
| Production Capacity | 3-4 Unit/H |
| Foaming Thickness | 30-100 Mm |
| Outer Casing Material | HDPE |
| Coating | Powder Coating |
|---|---|
| Principle | High-Pressure Air Type |
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Highlight | spray winding insulation pipe production line,polyurethane spraying foam preinsulated pipe machine,pre-insulated steel pipe making equipment |
| Coating | Powder Coating |
|---|---|
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Foaming Thickness | 30-100mm |
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Highlight | PU spray winding production line,polyurethane insulation pipe making machine,preinsulated steel pipe foam spraying equipment |
| Principle | High-Pressure Air Type |
|---|---|
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Foaming Thickness | 30-100mm |
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Highlight | Automatic PU foam spraying machine,Insulated pipe winding machine,Polyurethane preinsulated pipe making machine |
| Raw Material | PE |
|---|---|
| Application | Hot/ChillerWater/Oil /Chemical Material Pipeline |
| Foaming Thickness | 30-100mm |
| Cleaning Level | SA2.5 |
| Highlight | PU spraying foam preinsulated pipe line,PE winding preinsulated steel pipe machine,polyurethane foam pipe production line |
| Application | Hot/Chiller Water/Oil /Chemical Material Pipeline |
|---|---|
| Foaming Thickness | 30-100mm |
| Cleaning Level | SA2.5 |
| Capability | 3-4unit/H |
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Pipe Diameter | 508-1620mm |
|---|---|
| Foaming Thickness | 30-100mm (Customizable) |
| Operating Temperature | ≤120°C (Peak ≤140°C) |
| Medium Pressure | ≤2.5MPa |
| Closed-Cell Ratio | ≥88% |
| Outer Jacket Material | High Density Polyethylene (HDPE) |
|---|---|
| Turkkey Project | Provided |
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Turnkey Project | Yes |
| Computerized | Computerized |
| Highlight | Vacuum Calibration Method HDPE Polyurethane Foam Jacket Pipe Production Line,Siemens PLC Control Pre-insulated Steel Pipe Making Machine,48-2000mm Diameter Range Polyurethane Spraying Foam Pipe Equipment |
|---|---|
| Packaging Details | wodden box |
| Delivery Time | 70-90 days |
| Payment Terms | L/C,T/T |
| Supply Ability | 50 sets / Year |
| Pipe Jacking Machine | Integrated And Adjustable |
|---|---|
| Specification | ISO9001: 2008 |
| Calibration Method | Vacuum Calibration |
| Computerized | Computerized |
| Screw No. | Single-screw |