| Type | Coating Production Line |
|---|---|
| Control System | PLC |
| Heating Method | Induction Heating |
| Surface Treatment Grade | ≥SA2.5 |
| Highlight | Extrusion Capability 3LPE Coating Pipe Production Line,Municipal Infrastructure 3LPE Anti-Corrosion Coating Line,PLC Control System 3LPE Steel Pipe Coating Line |
| Type | Coating Production Line |
|---|---|
| Coating Layer | Internal Fbe And External 3lpe |
| Spray Gun Method | High Voltage Electrostatic Spray Gun |
| Applications | Oil, Natural Gas, And Water Supply Pipelines |
| Highlight | Internal FBE and External 3LPE Coating 3LPE Coating Pipe Production Line,High Voltage Electrostatic Spray Gun Steel Pipe Anti-Corrosion Coating Line,159-4200mm Specifications TPEP Coating Production Line |
| Coating | Powder Coating |
|---|---|
| Type | Coating Production Line |
| Clean Level | >=SA2.5 |
| Heating Method | Medium-Frequency Heating System |
| Highlight | Medium-Frequency Heating System 3LPE Coating Pipe Production Line,Clean Level >=SA2.5 Steel Pipe Anti-Corrosion Coating Line,Powder Coating FBE and 3LPE Coating Equipment |
| Type | Coating Production Line |
|---|---|
| Coating | Powder Coating |
| Spray Gun Method | High Voltage Electrostatic Spray Gun |
| Heating Method | Medium-Frequency Heating System |
| Highlight | FBE Internal Coating 3LPE Coating Pipe Production Line,Medium-Frequency Heating System Steel Pipe Anti-Corrosion Coating Line,High Voltage Electrostatic Spray Gun 3 Layer PE Pipe Production Line |
| Coating | Powder Coating |
|---|---|
| Principle | High-Pressure Air Type |
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Highlight | Automated Pre-Insulated Pipe Production Line,Rust Removal Steel Pipe Making Machine,Large-Diameter Insulation Polyurethane PU Spraying Foam Machine |
| Model NO. | FBE |
|---|---|
| Type | Coating Production Line |
| Clean Level | >=SA2.5 |
| Coating Material | Fbe Powder |
| Specification | 300-4200mm |
| After Sales Services | Overseas Installation, Free Technical Supporting |
|---|---|
| Warranty | 12 Months |
| Type | Coating Production Line |
| Coating | Powder Coating |
| Substrate | Steel |
| Coatingtype | 3-Layer Polyethylene (3LPE) |
|---|---|
| Materialcompatibility | Steel Pipes |
| Blasting | >2.5A |
| Connection Type | Welding |
| Origin | China |
| Principle | High-Pressure Air Type |
|---|---|
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Pipe Structure | Steel Pipe-Polyurethane Foam-HDPE Casing |
| Carrier Steel Pipe-Polyurethane Foam-HDPE Casing | 30-100mm |
| Highlight | High-Pressure Air Type PU Spray Foam Pipe Production Line,Steel Pipe-Polyurethane Foam-HDPE Casing Pre-Insulated Pipe Production Line,30-100mm Foaming Thickness Polyurethane Foam Pipe Production Line |
| Controlsystem | PLC Automatic Control |
|---|---|
| Application | Spraying Foam Insulation On Steel Pipes |
| Principle | High-Pressure Air Type |
| Pipe Material | Stainless Steel |
| Spary Material | Polyurethane |