| Pipe Material | Steel Pipe |
|---|---|
| Application | Oil, Natural Gas, Chemical Material, Water Pipelines. |
| Coating Structure | Epoxy+Adhesive+PE |
| Coating Type | External 3lpe Coating |
| Highlight | 200mm-1420mm 3LPE Coating Pipe Production Line,Epoxy+Adhesive+PE Steel Pipe Coating Line,Oil and Gas Pipelines 3LPE Anti-Corrosion Coating Machinery |
| Principle | High-Pressure Air Type |
|---|---|
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Outer Jacket Material | High Density Polyethylene (HDPE) |
| Computerized | Computerized |
| Product Specification | Tpipe Dia. 20-110mm |
| Medium Temperature | ≤120°C (incidental Peak Value <140°C) |
|---|---|
| Total Length | About 110m |
| Compressed Air | 6 M3/min >0.5MPa |
| Coating Thickness | 50-100mm |
| Operating System | Touch Screen |
| Coating Thickness | 50-100mm |
|---|---|
| Capability | 3-4unit/H |
| Voltage | 220V/380V |
| Medium Temperature | ≤120°C (incidental Peak Value <140°C) |
| Spiral Conveyor Line | Solid Tire |
| HS Code | 8477209000 |
|---|---|
| Automation | Automatic |
| Principle | High-Pressure Air Type |
| Foaming Thickness | 30-100mm |
| Production Capacity | 50 Sets/Year |
| Condition | New |
|---|---|
| Coating | Spray Winding |
| Warrantyperiod | 12 Months |
| Material | PE |
| Application | Spraying Foam Insulation On Steel Pipes |
| Type | Polyurethane Foam Machine |
|---|---|
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Rust Removal Quality | ≥2.5 Grade |
| Foaming Thickness | 30-100mm |
| Foaming Machine | High-Pressure Foaming Machine |
| Substrate | Steel |
|---|---|
| Condition | New |
| Capacity | 3000 Kw |
| Specification | 50 - 2173 Mm |
| Velocity | 1-6m/Min |
| Type | Polyurethane Foam Machine |
|---|---|
| Foaming Machine | High-Pressure Foaming Machine |
| Condition | New |
| Warranty | One Year |
| Highlight | polyurethane spray foam pipe production line,pre-insulated steel pipe machine,polyurethane spraying foam pipe maker |
| Specification | 508 - 1620 Mm |
|---|---|
| Pipe Structure | Steel Pipe Polyurethane Foam |
| Highlight | PU foam insulated pipe production line,polyurethane foam steel pipe machine,automated control preinsulated pipe line |
| Packaging Details | Standard Package |
| Delivery Time | 80 days |