| Warranty | 1 Year |
|---|---|
| Insulation Material | Polyurethane Foam |
| Control System | PLC Control |
| Extruder Power | 55kw |
| Screw Diameter | 120mm |
| Diameter Range | 110-2000mm |
|---|---|
| Cooling Method | Water |
| Warranty | 1 Year |
| Extruder | HSD-120x38 |
| Highlight | Pre Insulated Steel Pipe Production Line,Pre Insulated Pipework Production Line,Pre Insulation Pipe Production Line |
| Calibration Method | Vacuum Calibration |
|---|---|
| Material Of Barrel | 38CrMoAlA |
| Pipe Range | 110-2000mm |
| Cooling Method | Water Cooling |
| Production Scope | Product Line |
| Specification | PE-910 |
|---|---|
| Main Extruder | 130 |
| Pipe Diameter (mm) | 1160mm |
| Capacity (kg/h) | 600kg/h |
| Highlight | Continuous Pre Insulated Pipe Production Line,Pre Insulation Pipe Extrusion Line,Pre Insulated Steel Pipe Production Line |
| Specification | PE-880 |
|---|---|
| Main Extruder | 110 |
| Pipe Diameter (mm) | 960mm |
| Capacity (kg/h) | 800 |
| Highlight | Vacuum Casing Insulated Steel Pipe Production Line,960mm Steel Pipe Production Line,960mm Insulated Steel Pipe Production Line |
| Working Principle | High-Pressure Air Type |
|---|---|
| Control Mode | Computerized |
| Production Capacity | 3-4 Unit/H |
| Foaming Thickness | 30-100 Mm |
| Outer Casing Material | HDPE |
| Medium Pressure | ≤2.5MPa |
|---|---|
| Insulationmaterial | Polyurethane Foam |
| Foaming Thickness | 30-100mm |
| Pipe Jacking Machine | Integrated And Adjustable |
| Condition | New |
| Cutting Device | Planetary Cutter |
|---|---|
| Pipe Range | 110-2000mm |
| Material | HDPE LDPE |
| Extrusion Process | Multi-Layer Extrusion |
| Pipe Length | 6 Meters |
| Highlight | Continuous Pre Insulated Pipe Production Line,Pre Insulation Pipe Extrusion Line,Pre Insulated Steel Pipe Production Line |
|---|---|
| Payment Terms | T/T |
| Place of Origin | China |
| Brand Name | Huashida |
| Certification | CE, Rohs,TUV |
| Highlight | 3-layer polyethylene steel pipe line,anti-corrosion coated pipe production line,pre-insulated steel pipe coating line |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | L/C,D/A,D/P,T/T,Western Union |
| Supply Ability | 60sets/year |
| Place of Origin | Qingdao ,China |