| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Connection Type | Welding |
| Control System | PLC |
|---|---|
| Pipe Surface Preparation | Shot Blasting |
| Heating Method | Induction Heating |
| Coating Structure | Fbe, 2lpe, 3lpe |
| Condition | New |
| Pipe Dia. | 48-3000mm |
|---|---|
| PE Thickness | 2-3 Mm |
| Application | 3PE 2PE Fbe Anticorrosion Coating |
| Specification | EN253, EN448, EN728, ISO1133, ISO8501-1 |
| Substrate | Steel |
| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Connection Type | Welding |
| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Connection Type | Welding |
| Coating | Powder Coating |
|---|---|
| Surface Treatment Grade | ≥SA2.5 |
| Coating Material | Epoxy Powder, Adhesive, Polyethylene |
| Heating Method | Induction Heating |
| Induction Heating | Fbe, 2lpe, 3lpe |
| Control System | PLC |
|---|---|
| Pipe Surface Preparation | Shot Blasting |
| Heating Method | Induction Heating |
| Coating Structure | Fbe, 2lpe, 3lpe |
| Certification | CE, ISO, RoHS, REACH |
| Control System | PLC |
|---|---|
| Pipe Surface Preparation | Shot Blasting |
| Condition | New |
| Warranty | 1 Year |
| Heating Method | Induction Heating |
| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Connection Type | Welding |
| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Connection Type | Welding |