| Packaging Details | Standard Package |
|---|---|
| Delivery Time | 45 days |
| Payment Terms | L/C,D/A,D/P,T/T |
| Supply Ability | 50 units/ month |
| Place of Origin | Qingdao, China |
| Pipe Diameter | 20-2200mm |
|---|---|
| Calibration Method | Vacuum |
| Total Installation Power | 500kw |
| Usage | Gas / Water Supply Pipe |
| Packaging Details | Standard Package for Export |
| Screw No. | Single-screw |
|---|---|
| Automation | Automatic |
| Max Speed | 6m/Min,1.2m/Min |
| Field | Drainage/Water Supply/Sewage Discharge/Agricultura |
| Packaging Details | Standard Packing |
| Usage | Gas / Water Supply Pipe |
|---|---|
| Extrusion Capacity | 1000 (Kg/H) |
| Pipe Diameter | 20-2200mm |
| Calibration Method | Vacuum |
| Packaging Details | Standard Package for Export |
| Screw No. | Single-screw |
|---|---|
| Usage | Gas / Water Supply Pipe |
| Extrusion Capacity | 1000 (Kg/H) |
| Total Installation Power | 500kw |
| Packaging Details | Standard Package for Export |
| Usage | Gas / Water Supply Pipe |
|---|---|
| Customization | Customizable |
| Calibration Method | Acuum Calibration |
| Total Installation Power | 500kw |
| Packaging Details | Standard Package for Export |
| Application | For Producing Pre-Insulated Pipe Jacket |
|---|---|
| Pipe Diameter | From 12mm-2000mm |
| Raw Material | PE |
| Calibration Method | Vacuum And Water Spraying Cooling |
| Cutting Method | Planetary Cutting |
| Raw Materials | PE80, PE100 |
|---|---|
| Pipe Diameter Range | 20-2200mm |
| Application | Produce Water-Supply Gas-Supply Pressure Pipe |
| Packaging Details | Overseas Installation, Free Technical Supporting |
| Delivery Time | 60days |
| Certification | CE, ISO9001:2008 |
|---|---|
| Computerized | Computerized |
| Application | Gas Supply Pipe |
| Length | 36m, 52m, 72m |
| Diameter | 20-110, 75-250, 355-630 |
| Certification | CE, ISO9001:2008 |
|---|---|
| Computerized | Computerized |
| Application | Gas Supply Pipe |
| Length | 36m, 52m, 72m |
| Diameter | 20-110, 75-250, 355-630 |