| Raw Material | HDPE |
|---|---|
| Product Type | Plastic Pipe |
| Cutting Method | Chipless Cutting |
| Application | For Producing Pre-Insulated Pipe Jacket |
| Pipe Diameter | 110-2200mm Or Customized |
| Condition | New |
|---|---|
| Specification | Pipe Dia. 1380-2000mm |
| Screw | Single Screw |
| Output Capability | 250kg |
| Automation | Automatic |
| Packaging Details | loaded in container |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | L/C,T/T,Western Union |
| Supply Ability | 2 production line per month |
| Place of Origin | qingdao |
| Packaging Details | container |
|---|---|
| Delivery Time | 60-90 days |
| Payment Terms | L/C,T/T,Western Union |
| Place of Origin | China |
| Brand Name | Huashida |
| Packaging Details | CONTAINER LOAD |
|---|---|
| Delivery Time | 80 DAYS |
| Payment Terms | L/C,T/T,Western Union |
| Supply Ability | 10 SETS PER MONTH |
| Place of Origin | QINGDAO |
| Pipe Structure | Puf Insulation Layer, PE Outer Casing |
|---|---|
| Foaming Machine | High-Pressure Foaming Machine |
| High-Pressure Foaming Machine | 30-100mm |
| Applications | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Delivery Time | 60days |
| Type | Pipe Extruder |
|---|---|
| Plastic Processed | PE |
| Feeding Mode | One Feed |
| Product Type | Extrusion Molding Machine |
| Assembly Structure | Separate Type Extruder |
| Type | Coating Production Line |
|---|---|
| Heating Type | Induction Heating |
| Condition | New |
| Cooling Type | Water Cooling |
| Clean Level | >=SA2.5 |
| Power Supply | 3 Phrase, 380V 50Hz |
|---|---|
| Screw No. | Single-screw |
| Customized | Customized |
| After-sales Service | Technical Service With Free,Training The Workers |
| Certification | CE, ISO9001:2008, QS, GMP |
| Coating Layer | 3-Layer PE Coating |
|---|---|
| Condition | New |
| Warranty | 1 Year |
| Pipe Surface Treatment | No Less Than SA2.5 |
| PE Thickness | 2-3mm |