| Coating | Powder Coating |
|---|---|
| Surface Treatment Grade | ≥SA2.5 |
| Coating Material | Epoxy Powder, Adhesive, Polyethylene |
| Heating Method | Induction Heating |
| Induction Heating | Fbe, 2lpe, 3lpe |
| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Connection Type | Welding |
| Coating | Powder Coating |
|---|---|
| Certification | CE, ISO |
| Pipe Dia. | 159-4200mm |
| PE Coating Model | Wrapping |
| Blasting | >2.5A |
| Coating | Powder Coating |
|---|---|
| Certification | CE, ISO |
| Pipe Dia. | 159-4200mm |
| PE Coating Model | Wrapping |
| Blasting | >2.5A |
| Coating Layer | Internal&External Pipe Wall |
|---|---|
| Function | Steel Pipe Sand Blasting |
| Operation Method | Automatic |
| Pipe Surface Preparation | Shot Blasting |
| Cooling Water | ≤15℃,0.15-0.2MPa,0.5m³/min |
| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Connection Type | Welding |
| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Connection Type | Welding |
| Coating | Powder Coating |
|---|---|
| Surface Treatment Grade | ≥SA2.5 |
| Coating Material | Epoxy Powder, Adhesive, Polyethylene |
| Heating Method | Induction Heating |
| Induction Heating | Fbe, 2lpe, 3lpe |
| After-Sales Service | Engineers Available To Service Machinery Overseas |
|---|---|
| Coating Thickness Range | 1.5mm-4.5mm |
| Control System | PLC Control |
| Pipe Diameter Range | DN50-DN1200 |
| Coating Layers | 3 Layers (FBE, Adhesive, PE) |
| Pipe Diameter Range | DN50-DN1600mm |
|---|---|
| Coating Thickness Range | 1.5mm-4.5mm |
| Total Length | 80m |
| Application | Oil And Gas Pipeline |
| Production Speed | 2-12m/min |