| Certification | CE, ISO9001:2008 |
|---|---|
| Computerized | Computerized |
| Application | Gas Supply Pipe |
| Length | 36m, 52m, 72m |
| Diameter | 20-110, 75-250, 355-630 |
| Certification | CE, ISO9001:2008 |
|---|---|
| Computerized | Computerized |
| Application | Gas Supply Pipe |
| Length | 36m, 52m, 72m |
| Diameter | 20-110, 75-250, 355-630 |
| Pipe Diameter | 20-630mm |
|---|---|
| Transport Package | Standard Package For Export |
| Calibration Method | Vacuum |
| Automation | Automatic |
| Computerized | Computerized |
| Screw No. | Single-screw |
|---|---|
| Extrusion Process | Multi-Layer Extrusion |
| Pipe Color | Black + Yellow Or Blue |
| Automation | Automatic |
| Calibration Method | Vacuum |
| Screw No. | Single-screw |
|---|---|
| Extrusion Process | Multi-Layer Extrusion |
| Pipe Color | Black + Yellow Or Blue |
| Automation | Automatic |
| Calibration Method | Vacuum |
| Pipe Diameter | 20-2200mm |
|---|---|
| Calibration Method | Vacuum |
| Total Installation Power | 500kw |
| Usage | Gas / Water Supply Pipe |
| Packaging Details | Standard Package for Export |
| Mold Type | Spiral Mold |
|---|---|
| Calibration Method | Vacuum |
| Application | Produce Water-Supply Gas-Supply Pressure Pipe |
| Pipe Diameter Specification | 20-2200mm |
| Packaging Details | Standard Export Package |
| Raw Material | PE80, PE100 |
|---|---|
| Control System | Siemens |
| Calibration Method | Vacuum |
| Packaging Details | Standard Export Package |
| Delivery Time | 60days |
| Automation | Automatic |
|---|---|
| Condition | New |
| Raw Material | PE80, PE100 |
| Package Size | 800.00cm * 220.00cm * 200.00cm |
| Packaging Details | Standard Export Package |
| Raw Materials | PE80, PE100 |
|---|---|
| Pipe Diameter Range | 20-2200mm |
| Application | Produce Water-Supply Gas-Supply Pressure Pipe |
| Packaging Details | Overseas Installation, Free Technical Supporting |
| Delivery Time | 60days |