Model NO. | FBE |
---|---|
Type | Coating Production Line |
Coating | Powder Coating |
Substrate | Steel |
Certification | CE, ISO, RoHS |
Style | Handheld |
---|---|
Character | Compact Design, Light In Weight |
Transport Package | Standard Package |
HS Code | 846880000 |
Voltage | 220V 50Hz |
Warranty | 1 Year |
---|---|
Coating Type | 3LPE (Three-Layer Polyethylene) |
Control System | PLC |
Power Supply | 380V/50Hz |
Product Type | Pipe Production Line |
Warranty | 1 Year |
---|---|
Coating Type | 3LPE (Three-Layer Polyethylene) Coating |
Product Type | Pipe Production Line |
Material | Steel |
Heating Method | Induction Heating |
Pipe Range | 110-2000mm |
---|---|
Packaged | Wooden Cases And Pallets |
Voltage | 380V 50Hz |
Delivery Time | 40-60days |
Usage | Water/Gas/Oil Supply Pipeline |
Style | Handheld |
---|---|
Character | Compact Design, Light In Weight |
Transport Package | Standard Package |
HS Code | 846880000 |
Voltage | 220V 50Hz |
Specification | 2.5mm To 4mm |
---|---|
Production Capacity | 5 Tons/Day |
Transport Package | Standard Package |
HS Code | 39169090 |
Payment Terms | Western Union,T/T,D/P |
Transport Package | Standard Package |
---|---|
Application | For Producing Pre-Insulated Pipe Jacket |
Specification | 110-2200mm |
Raw Material | PE |
Calibration Method | Vacuum And Water Spraying Cooling |
Type | Coating Production Line |
---|---|
Coating Structure | Fbe, 2lpe, 3lpe |
Condition | New |
Packaging Details | Standard Package for Export |
Delivery Time | 60Days |
Material | Steel |
---|---|
Type | Coating Production Line |
Coating | PE |
Condition | New |
3PE Structure | Epoxy+Adhesive+Extruded Polyethylene |