| Total Length | About 110m |
|---|---|
| Coating | Spray Winding |
| Medium Temperature | ≤120°C (incidental Peak Value <140°C) |
| Turkkey Project | Provided |
| Operating System | Touch Screen |
| Application | Producing Pre-Insulated Pipe Jacket |
|---|---|
| Cutting Method | Dust-Free Planetary Cutting |
| Screw No. | Single-screw |
| Computerized | Computerized |
| After-sales Service | Technical Service With Free,Training The Workers |
| Coating | Powder Coating |
|---|---|
| Substrate | Steel |
| Capability | 3-4unit/H |
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Packaging Details | Wodden Box |
| Product Material | HDPE |
|---|---|
| Application | Producing Pre-Insulated Pipe Jacket |
| Control System | Siemens |
| Manufacturer | Qingdao Huashida Machinery Co., Ltd |
| Customized | Customized |
| Control System | Siemens |
|---|---|
| Computerized | Computerized |
| Cutting Method | Dust-Free Planetary Cutting |
| Exhaust | Exhaust |
| Customized | Customized |
| Automation | Automatic |
|---|---|
| Computerized | Computerized |
| Exhaust | Exhaust |
| Cutting Method | Dust-Free Planetary Cutting |
| Materialtype | Steel Pipe, Polyurethane Foam, HDPE Outer Pipe |
| Condition | New |
|---|---|
| Material | PE/PUR |
| Control System | PLC |
| Heating Method | Electric Heating |
| Humidity | 85% Non Condensing |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 100set a year |
| Place of Origin | China |
| Automation | Automatic |
|---|---|
| Certification | CE, QS |
| Condition | New |
| Application | For Producing Pre-Insulated Pipe Jacket |
| Raw Material | PE |
| Product Type | Plastic Pipe |
|---|---|
| Screw | Single-Screw |
| Application | For Producing Pre-Insulated Pipe Jacket |
| Specification | Vacuum Calibration System |
| Assembly Structure | Separate Type Extruder |