| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Cooling Circulating Water | ≤20°C, ≥0.3 MPa, 20 M³/H |
|---|---|
| Product Type | Pipe Production Line |
| Material | HDPE (High-Density Polyethylene) |
| Heating Method | Induction Heating |
| Coating Layers | 3 Layers |
|---|---|
| Control System | PLC |
| Pipe Surface Preparation | Shot Blasting |
| Origin | China |
| Screw No. | Single-screw |
|---|---|
| Pipe Diameter | 200-800,300-1200,1000-2000,2000-3000 |
| Installed Power | 180kw,230kw,400kw,680kw |
| Speed | 6-12m/H,4-12m/H,2-5m/H,0.5-3m/H |
| Coating | Powder Coating |
|---|---|
| Substrate | Steel |
| Consists | first FBE coating, middle adhesive layer and the outside polyethylene layer |
| Used for | transmission of oil, gas, water |