Model | PE-850/1372 |
---|---|
Drying Machine | HSD-1200 |
Calibration Method | Vacuum And Water Cooling |
Cooling Method | Water Cooling |
Packaging Details | according to the actual condition |
Outer Jacket Material | High Density Polyethylene (HDPE) |
---|---|
Turkkey Project | Provided |
Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
Turnkey Project | Yes |
Computerized | Computerized |
Head Type | Round |
---|---|
Application | Insulation Pipe |
Thickness | 2-18mm |
Packaging Details | Standard Package |
Delivery Time | 60days |
Diameter Range | 110-2000mm |
---|---|
Cooling Method | Water |
Warranty | 1 Year |
Extruder | HSD-120x38 |
Usage | Pipe-in-Pipe Assembling |
For Pipe Range | 200-2600mm |
---|---|
Raw Material Density | Above 0.935 |
Material | HDPE |
Application | Pipeline Joint Closure |
Packaging Details | standard packing |
Condition | New |
---|---|
Color | Custom |
Application | For Producing Pre-Insulated Pipe Jacket |
Pipe Diameter | From 360-1680mm |
Packaging Details | Stardard Package |
Computer System | Full Auto |
---|---|
Cutting Size | 110-2200mm |
Specification | HDPE Pipe |
Packaging Details | Standard Package |
Delivery Time | 60DAYS |
Customized | Customized |
---|---|
Pipe Material | HDPE, |
Computerized | Computerized |
Transport Package | Standard Package |
Screw No | Single-screw |
Coating Type | PE Extrusion Coating |
---|---|
Coating Thickness | 1.8-4mm |
Pipe Cleaning Method | Shot Blasting |
Heating Method | Induction Heating |
Cooling Method | Water Cooling |
Flammability | Self-extinguishing |
---|---|
Color | Black |
Scope Of Application | Pipe Anticorrosive Patching |
Water Absorption | 0.1% |
Elongation At Break | 200% |