Packaging Details | Standard packaging |
---|---|
Delivery Time | 90 days |
Payment Terms | T/T |
Supply Ability | 100set a year |
Place of Origin | China |
Packaging Details | Standard packaging |
---|---|
Delivery Time | 90 days |
Payment Terms | T/T |
Supply Ability | 100set a year |
Place of Origin | China |
Condition | New |
---|---|
Color | Custom |
Cutting Method | Dust-Free Planetary Cutting |
Calibration Method | Vacuum And Water Spraying Cooling |
Specification | 110-2200 |
Location | Indoor |
---|---|
Temperature | 0-30℃ |
Humidity | ≤15℃,0.15-0.2MPa,0.5m³/min |
Workshop Area | Length 120 Meters, Width No Less Than 24 Meters |
Transmission System Specification | Length 3 M Width 0.85m |
Location | Indoor |
---|---|
Temperature | 0-30℃ |
Humidity | ≤15℃,0.15-0.2MPa,0.5m³/min |
Cyclone | Ø1000 |
Transmission System Specification | Length 3 M Width 0.85m |
Welding Core Type | Plastic |
---|---|
Stainless Steel Welding Rod Type | PE/PP/PS/HIPS/ABS/PVC |
Welding Power | AC |
Rod Dia. | 3.5mm-4mm |
Packaging Details | Mandrel and Carton |
Application | Pipeline Joint Closure |
---|---|
Product Thickness | 0.2-3mm |
Warranty | 24 Months |
Customized | Customized |
Product Width | 800-3000mm |
Type | Coating Production Line |
---|---|
Substrate | Steel Condition |
Steel Condition | Induction Heating |
Packaging Details | Standard Package |
Delivery Time | 60Days |
Pipe Range | 50-426mm |
---|---|
Type | Coating Production Line |
Certification | CE,ISO 9001 |
Condition | NEW |
Control System | PLC |
Applicationpipeline Joint Closure | Pipeline Joint Closure |
---|---|
Thickness | 2-18mm |
Usage | Weld HDPE Pipe |
Packaging Details | Standard Package |
Delivery Time | 60Days |