| Packaging Details | By order |
|---|---|
| Delivery Time | 70-90 days |
| Payment Terms | L/C,D/A,D/P,T/T |
| Supply Ability | 50 sets /year |
| Place of Origin | Qingdao,Huashida |
| Board Layers | Multilayer |
|---|---|
| Screw No. | Single-screw |
| Aapplication | Protection Pipeline , Anticorrosion, Repair |
| Automation | Automatic |
| Packaging Details | Standard Package |
| Packaging Details | standard packing |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | L/C,T/T |
| Supply Ability | 50 units/ years |
| Place of Origin | Qingdao,China |
| Heating Temperature | 220-250℃ |
|---|---|
| Cooling Method | Water Cooling |
| Installed Capacity | 2700kw |
| Coating Structure | 3 Layers (Epoxy Primer, Adhesive Layer, Polyethylene Topcoat) |
| Application | Oil And Gas Pipeline Coating |
| Coating Thickness | 1.8-2.7mm |
|---|---|
| Control System | PLC Control |
| Coating Type | 3LPE (Three Layer Polyethylene) |
| Pipe Diameter Range | Φ219-Φ1420mm |
| Total Power | 900kW |
| After-sales Service | Installation And Training |
|---|---|
| Speed | 6m-10m/Min |
| Pipe Performance | Flexible Or Rigid |
| Packaging Details | Standard Package |
| Delivery Time | 60Days |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 100set a year |
| Place of Origin | China |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 100set a year |
| Place of Origin | China |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 100set a year |
| Place of Origin | China |
| Heating Method | Induction Heating |
|---|---|
| Temperature | 0-30℃ |
| Coating Type | 3PE, 2PE, Fbe |
| Moisture | 85% No Condensation |
| Extrusion Process | Multi-Layer Extrusion |