| Material | HDPE |
|---|---|
| Application | Pipeline Joint Closure |
| Application Area | Directly Buried Pre-Insulated Pipe |
| Packaging Details | Plastic Film and Wooden Case |
| Delivery Time | 60days |
| Application | Pipeline Joint Closure |
|---|---|
| Transport Package | Standard Package |
| HS Code | 3921909090 |
| Connection | Welding |
| Customized | Customized |
| Thickness | 2-16mm |
|---|---|
| Connection | Welding |
| Application | Pipeline Joint Closure |
| Packaging Details | Standerd packaging |
| Delivery Time | 60DAYS |
| Material | HDPE/PP |
|---|---|
| Application | Oil And Natural Gas Pipelines |
| Density | ≥0.98g/cm³ |
| Packaging Details | Standard Package |
| Delivery Time | 60days |
| Board Layers | Single Layer, Double Layer, Multi-Layer |
|---|---|
| Screw No. | Multi-screw |
| Frequency Converter | ABB |
| Thickness | 0.1-30m |
| Applicable Materials | PP/PE/PS/HIPS/ABS/PVC |
| Application Area | Directly Buried Metal Reinforced Corrugated Pipes |
|---|---|
| Connection | Welding |
| Material | HDPE |
| Packaging Details | Plastic Film and Wooden Case |
| Delivery Time | 60days |
| Material | HDPE |
|---|---|
| Application | Pipeline Joint Closure |
| Application Area | Directly Buried Pre-Insulated Pipe |
| Packaging Details | Plastic Film and Wooden Case |
| Delivery Time | 60days |
| Head Type | Round |
|---|---|
| Application | Insulation Pipe |
| Thickness | 2-18mm |
| Packaging Details | Standard Package |
| Delivery Time | 60days |
| Packaging Details | Standard Package |
|---|---|
| Delivery Time | 45-75 days |
| Payment Terms | T/T,D/P,D/A,L/C |
| Supply Ability | 50 Units/Month |
| Place of Origin | Qingdao, China |
| For Pipe Range | 200-2600mm |
|---|---|
| Raw Material Density | Above 0.935 |
| Material | HDPE |
| Application | Pipeline Joint Closure |
| Packaging Details | standard packing |