Shot/Grit Separator | 100T |
---|---|
20# Channel Steel Double Row | 20# Channel Steel Double Row |
Steel Pipe Ferry Mechanism | Cylinder |
Spiral Conveyor Line | Solid Tire |
Steel Shot/grit Elevator | 100T |
PU Sprayed Foaming HDPE Winding Preinsulation Pipe Continuous Production Line | 20# Channel Steel Double Row |
---|---|
20# Channel Steel Double Row | 20# Channel Steel Double Row |
Steel Pipe Ferry Mechanism | Cylinder |
Spiral Conveyor Line | Solid Tire |
Steel Shot/grit Elevator | 100T |
Shot/Grit Separator | 100T |
---|---|
Steel Shot/grit Elevator | 100T |
Pulse Filter Cartridge Dust Collector | 32 Filter Cartridge |
Centrifugal Induced Draft Fan | 22KW |
Intermediate Frequency Heater | 300KW |
Voltage | 220V/380V |
---|---|
Cooling Method | Water Cooling |
Raw Material | Steel Pipe |
Warranty | 1 Year |
Total Power | 120-300kW |
Voltage | 220V/380V |
---|---|
Cooling Method | Water Cooling |
Raw Material | Steel Pipe |
Warranty | 1 Year |
Total Power | 120-300kW |
Application | Supply Hot Water/Oil Delivery/Chemical Material |
---|---|
Cyclone Dust Collector | 1m |
Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
Material | PE/PUR |
Coating Thickness | 50-100mm |
Cooling Circulating Water | ≤20℃ ≥0.3Mpa 26~30 M3/h |
---|---|
Humidity | 85% Non Condensing |
Compressed Air | 6 M3/min >0.5MPa |
Pipe Usage | PU Pre-Insulation |
Total Length | About 110m |
Application | Produce District Heat Distribution Pipe |
---|---|
Pipe Structure | Steel Working Pipe-Polyurethane Foam-HDPE Casing |
Compressed Air | 6 M3/min >0.5MPa |
Pipe Usage | PU Pre-Insulation |
Total Length | About 110m |
Application | Produce District Heat Distribution Pipe |
---|---|
Pipe Structure | Steel Working Pipe-Polyurethane Foam-HDPE Casing |
Compressed Air | 6 M3/min >0.5MPa |
Pipe Usage | PU Pre-Insulation |
Total Length | About 110m |
Application | Produce District Heat Distribution Pipe |
---|---|
Pipe Structure | Steel Working Pipe-Polyurethane Foam-HDPE Casing |
Loading Way | Vacuum Automatic Feeding |
Pipe Usage | PU Pre-Insulation |
Derusting Load Up Pipe Rack | 20# Channel Steel Double Row |