Product Overview
The 3PE anti-corrosion coating production line is designed for applying a three-layer coating to steel pipes, enhancing their mechanical strength, electrical insulation, and durability. It is ideal for oil, gas, water, and other fluid transmission pipelines.
Key Features:
·Enhances pipe lifespan from 5-10 years to 50-100 years
·High mechanical strength, excellent electrical insulation, waterproof, wear-resistant, and anti-aging properties
·Suitable for harsh environments and corrosive conditions
Production Line Process
Product Picture![]()
![]()
![]()
![]()
![]()
![]()
![]()
Available technical parameters are as follows:
| Pipe diameter | 508-2540mm (Production line designed based on customer's required diameter range) |
| Pipe length | 8-18m |
| Processing capacity | ≥250m2/h, maximum design speed of our production line can reach 800 m2/h. |
| Cleaning level | ≥Sa2.5 |
| Materials for production | Epoxy powder, Adhesive, Polyethylene |
| Coating Thickness | -FBE 80-120μm -AD 170-250μm -PE 3mm-3.7mm This is the standard range, can be changed based on different requirement -Single FBE 100-300mm |
Main Equipment List
| No. | Name | Set |
| A. External Derusting Equipment | ||
| 1 | Pipe support rack | depend |
| 2 | Pipe wheel conveyor | 1 |
| 3 | Shot Blasting Machine | 1 |
| 4 | Dust Collector (cartridge/ Filter bag/Cyclone) | 1 |
| 5 | Centrifugal exhaust fan | 1 |
| 6 | Rust removal equipment PLC | 1 |
| B. Internal Shot Blasting Equipment | ||
| 1 | Internal Shot Blasting Trolley | 1 |
| 2 | Travelling Rail | 1 |
| 3 | Sand Filling Rack | 1 |
| 4 | Internal Blasting Lance | 2 |
| 5 | Pipe End Sealing Chamber | 2 |
| 6 | Pipe Rotator | 2 |
| 7 | Dust collector | 1 |
| 8 | Equipment Electrical Control System | 1 |
| C. Internal FBE | ||
| 1 | Induction heating device | 1 |
| 2 | Internal Powder Spraying Suspension Rod | 1 |
| 3 | SS Powder Coating Booth | 1 |
| 4 | Internal Epoxy Spraying Booth | 1 |
| 5 | Fluidizing Box | 1 |
| 6 | Dust Collector | 1 |
| 7 | Equipment Electrical Control System | 1 |
| D. Coating equipment | ||
| 1 | Pipe support rack | depend |
| 2 | Pipe wheel conveyor | 1 |
| 3 | Induction heating device | 1 |
| 4 | Powder spraying device | 1 |
| 5 | Automatic loading dryer | 2 |
| 6 | SJ-75/30 Extruder | 1 |
| 7 | SJ-150/33 Extruder | 1 |
| 8 | Hot melt adhesive extruder die | 1 |
| 9 | PE sheet extruder head mold | 1 |
| 10 | Hot melt adhesive/PE sheet coating device | 1 |
| 11 | Environmental Protection Ventilation equipment | 1 |
| 12 | Cooling Spray equipment | 1 |
| E.Platform Equipment | ||
| 1 | Steel pipe uploading platform | Depend on layout |
| 2 | Downloading platform | Depend on layout |
| 3 | Pipe storage platform | Depend on layout |
| 4 | Turnover machanism | Depend on layout |
| F.Groove Equipment | ||
| 1 | PE Beveling Machine | 2 |
| 2 | Hydraulic Lifting and Turning Machinery | Depend on layout |
| 3 | Hydraulic Equipment | Depend on layout |
| 4 | PLC automatic control system | 1 |
Note: Equipment configuration and quantity are customized according to customer requirements, with no fixed standard
Frequently Asked Questions
![]()
After Sales Service
-The guarantee period is 12 months for machinable parts, 6monthes for electrical parts. After the end of the Guarantee period the Supplier is obliged to provide with lifelong service at the expense of Buyer.
-During a warranty period of exploitation the Seller undertakes to execute warranty service of the equipment, troubleshooting and replacement of out of service spares, except for breakings, bound with incorrect exploitation of the equipment by the Buyer.
-Seller provide the technical service with free, and training the workers of buyers.
Company Profile![]()
Exhibition![]()
Certification![]()