logo

Advanced 3PE Anti-Corrosion Coating Production Line for Steel Pipe

1 set
MOQ
US$176,500.00 - 2000,000.00 1 Set (MOQ)
Price
Advanced 3PE Anti-Corrosion Coating Production Line for Steel Pipe
Features Gallery Product Description Request A Quote
Features
Specifications
Blasting: >2.5A
Specification: EN253, EN448, EN728, ISO1133, ISO8501-1
Pipe Dia.: 57-4200mm
Substrate: Steel
Basic Infomation
Place of Origin: Qingdao,China
Brand Name: Huashida
Certification: CE,ISO9001:2008
Model Number: 58-3500 mm
Payment & Shipping Terms
Packaging Details: Standard Package
Delivery Time: 70-90 days
Payment Terms: L/C,T/T
Supply Ability: 30 set / year
Product Description

Advanced 3PE Anti-Corrosion Coating Production Line for Steel Pipe


Basic Info.

Model NO.
57-4200mm
Type
Coating Production Line
Coating
Powder Coating
Substrate
Steel
Certification
ISO
Condition
New
Pipe Dia.
57-4200mm
Blasting
>2.5A
Transport Package
Standard Package
Specification
EN253, EN448, EN728, ISO1133, ISO8501-1
Trademark
HSD
Origin
Qingdao China
HS Code
8479819000
Production Capacity
10 Units/Year

Packaging & Delivery

Package Size
1000.00cm * 220.00cm * 260.00cm
Package Gross Weight
1000.000kg
Product Parameters
 

Steel pipe outside shot blasting derusting operation line

No.

Description

Qty.

Remark

1

Transmission line

1set


2

Shot  blasting derusting line

1set


3

Cyclone  dust collector

1set


4

Pulse filter cartridge dust collector

1set


5

Centrifugal wind blower

1set


6

Derusting equipment electrical control system


1set


Steel pipe outside spiral 3PE production line

No.

Description

Qty.


1

Coating transmit system

1set


2

Intermediate   frequency heating system

1set


3

Epoxy   spraying system

1set


4

Automatic feeding dryer

2sets


5

single screw high efficiency extruder SJ-65/30


1set


6

SJ-120/30   extruder

1set


7

Hot melt   adhesive extrusion die head

1set


8

PE   sheet  extrusion die head

1set


9

Hot melt   adhesive/PE sheet press device

1set


10

Stainless steel spray powder chamber

1set


11

Cooling water spray system

1set


Platform system

No.

Description

Qty.


1

Steel pipe   up load platform

1set


2

Derusting   transition platform

1set


3

Finished   pipe storage system

1set


4

Hydraulic   system

3sets


Grooving system

No.

Description

Qty.


1

PE grooving   device

2sets


2

Hydraulic elevating pipe turner

2sets


3

Operating   cabinet

1set


The configrition will change through different customer requirment 

The steel pipe anti-corrosion coating production line is engineered to apply protective coatings for steel pipes of diverse diameters, widely deployed for heating, gas and oil pipeline projects. It accommodates multiple coating processes: FBE, dual-layer FBE, 2-layer PE, 2-layer PP and classic 3LPE three-layer polyethylene systems.

3LPE Coating Structure

The 3LPE system adopts a three-tier composite structure:

  • Epoxy powder primer: delivers robust adhesion and anti-corrosion performance
  • Adhesive intermediate layer: creates reliable bonding between primer and outer sheath
  • Polyethylene top layer: provides mechanical shielding and electrical insulation

This layered construction delivers outstanding anti-corrosion, anti-aging and mechanical properties, substantially prolonging pipeline service life under harsh operating conditions.

Performance Advantages

--Consistent running performance and homogeneous coating finish
--Enables continuous anti-corrosion treatment for multi-specification steel pipes
--High flexibility for a wide range of pipe diameters and coating materials


Process:

Pipe loading to the rack → Feeding to main conveyor via shuttle mechanism  → Medium-frequency preheating → External shot blasting (with external dust removal system) → External derusting inspection (unqualified pipes return) → Pipe transfer by lifting trolley → internal shot blasting (with internal dust removal) → Internal derusting inspection (unqualified pipes return) → Label sticking on pipe ends for qualified pipes
Straight conveying → Transfer to 3PE coating station →  IF Heating →FBE Powder Coating→ AD Adhesive powder Spraying→PE Wrapping→ Silicone Roller Compaction→PE Layer seperating→Water Cooling→Transfer Mechanism Offline Loading→ Holiday inspection → Pipe marking, packaging and finished product unloading

Blasting Deruster for Steel Pipe and Coated Pipe and Internal Fbe Coating Line







Blasting Deruster for Steel Pipe and Coated Pipe and Internal Fbe Coating LineBlasting Deruster for Steel Pipe and Coated Pipe and Internal Fbe Coating Line
Detailed Photos


Blasting Deruster for Steel Pipe and Coated Pipe and Internal Fbe Coating LineBlasting Deruster for Steel Pipe and Coated Pipe and Internal Fbe Coating LineBlasting Deruster for Steel Pipe and Coated Pipe and Internal Fbe Coating Line
FAQ

Question & Answer: 
Q1. What is Size of Pipe Dia. your equipment can produce ?
A: We can produce four main Model:
Diameter of steel Pipe:
48-219mm.
219-1220 - mm
800-1600 - mm
1000-2400 - mm
Q2. What is Descaling grade?
A:SA2.5?
Q3.What is Delivery Time
A: 2-3monthes after deposit.
Q4. Coating thickness: 
       A: 80~800um
Q6. Which country did you sell your 3PE equipment? 
A. We have produced nearly 50sets 3PE processing line at home and abroad. Such as Russia, Iran, UAE, Iran, India, Belarus, Kazakhstan and so on.
Q7. After-sales service: 
A:  Warranty period:
Before delivery all the equipment must be trial operated  to confirm the quantity perfectly. 
The warranty period is 12 months from the date of pick-up for mechanical part , and 6 months  for the electrical part.
Service:
The seller provides free technical services and provides training and guidance to buyer operators.

Company Profile

Qingdao Huashida Machinery Co., Ltd is a professional plastic extrusion production line manufacture since 2003. The factory covers 34000 square meters.

Our products such as HDPE pressure pipe for gas or water transmission, structural wall pipe extrusion line, corrugated pipe extrusion line. The products have been exported to Middle East, Russia, Africa. Turkey, Korea.
Our factory locates in Chengyang Industrial area, Qingdao, Shandong Province. We have been approved and got certificate ISO90001:2008 by SGS. All the customers are welcome to visit the factory.
Packaging & Shipping

Blasting Deruster for Steel Pipe and Coated Pipe and Internal Fbe Coating LineBlasting Deruster for Steel Pipe and Coated Pipe and Internal Fbe Coating LineBlasting Deruster for Steel Pipe and Coated Pipe and Internal Fbe Coating LineBlasting Deruster for Steel Pipe and Coated Pipe and Internal Fbe Coating Line




Recommended Products
Get in touch with us
Contact Person : Ms. yuki
Tel : +8615953227920
Fax : 86-532-57780399
Characters Remaining(20/3000)