logo

Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline

1
MOQ
175000$ - 177000$
Price
Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline
Features Gallery Product Description Ratings & Review Request A Quote
Features
Specifications
After-sales Service: Installation Training
Warranty: 12 Months
Product Type: PE Board
Board Layers: Multilayer
Screw No.: Single-screw
Automation: Automatic
Computerized: Computerized
Customized: Customized
Condition: New
Transport Package: Standard Package
Sleeve Thickness: 0.5-3mm
Peel Strength: >150n/Cm (ASTM D1000)
Water-Intake Rate: 0.05% (ASTM D570)
Tensile Strength: 15-20MPa (ASTM D638)
Shear Strength: ≥100n/Cm (DIN 30 672)
Adhesive Softening Point: 70-80°C (ASTM E 28)
Model: Model1350
Highlight:

Cross-Linked HDPE heat shrink sleeve line

,

Oil gas pipeline production line

,

Pre-insulated pipe manufacturing equipment

Basic Infomation
Place of Origin: Qingdao, China
Brand Name: Huashida
Certification: CE, ISO9001:2008, QS
Model Number: Model 1350
Payment & Shipping Terms
Packaging Details: 600.00cm * 230.00cm * 220.00cm
Delivery Time: 60 days
Payment Terms: L/C,T/T,Western Union
Supply Ability: 100 unit/year
Product Description
Cross-Linked HDPE Heat Shrink Sleeve Line Production Line for Oil & Gas Pipeline

Developed by Qingdao Huashida Machinery Co., Ltd. with over 20 years of industrial manufacturing experience, this high-efficiency, energy-saving heat shrinkable tape and sleeve production line is an intelligent integrated system dedicated to producing premium pipeline anti-corrosion and joint sealing materials.

Adopting cutting-edge extrusion, irradiation crosslinking, and online lamination technology, the line can manufacture standard two-layer heat shrinkable products and upgraded three-layer fiberglass reinforced heat shrinkable tape/sleeve, widely applied for joint corrosion protection, repair, and sealing of various municipal, oil and gas, and industrial pipelines.

The whole line features low energy consumption, low noise, stepless speed regulation, and a high degree of automation, leading the domestic and international industry in technical performance and product quality.

Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 0
Finished Products
  • Standard Products: 650mm width, Two-layer PE heat shrinkable tape, sleeve-type heat shrinkable sleeves, clip-on heat shrinkable sleeves
  • Upgraded Products: Three-layer fiberglass reinforced PE heat shrinkable tape/sleeve
Product Applications

Applicable Pipelines: Hollow wall spiral wound pipes, steel-reinforced spiral corrugated pipes, plastic-steel spiral wound pipes, double-flat-wall plastic-steel spiral wound pipes, PVC-U sewage pipes, polyurethane foam insulated pipes (black and yellow jacket pipes), 3PE/2PE steel pipes, seamless steel pipes, large diameter wastewater pipes, and other ordinary steel pipelines.

Main Application Fields: Municipal pipeline engineering, oil and gas long-distance transmission pipelines, industrial fluid pipelines, pre-insulated pipeline joint closure, pipeline damage repair, girth weld straight joint field coating

Heat Shrinkable Sleeve for Oil & Gas Pipe
Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 1
Heat-shrinkable Sleeve for Thermo Insulated Pipe
Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 2
For Metal Reinforced HDPE Corrugated Pipe (Drainpipe)
Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 3
Production Line Composition

Complete Line Structure:

  • RS-800 PE Backing Extrusion Line: Output 150-200kg/h, responsible for high-purity LDPE substrate forming
  • TJ-700 Adhesive Coating Line: Completes online adhesive coating, stretching, and shaping
  • Fiberglass Reinforced Upgrade Configuration: Fiber unwinding, heating, and leveling equipment, 65/30 single-screw extruder, special T-shaped flat-head die
  • Auxiliary & Control System: Irradiation crosslinking equipment, cooling system, haul-off unit,  electric control system, ABB main motor
Operating Environmental Conditions
  • Working Place: Indoor, no dangerous area
  • Power Supply: 380V 50HZ (-10%, +5%)
  • Humidity: ≤85%, no condensation
  • Circulating Cooling Water: ~0.5m³/min (≤20ºC, 0.3Mpa)
  • Compressed Air: ~0.4m³/min, >0.5Mpa
Main Equipment List
RS-800 PE Backing Extruder Line
No. Equipment Name Quantity
1 Automatic Vacuum Feeder 1 Set
2 Hopper Dryer 1 Set
3 SJ-90*30 Single Screw Extruder 1 Set
4 T-Die Mold 1 Set
5 Hydraulic Filter Screen Changer 1 Set
6 3-Roller Calender 1 Set
7 Roller Temperature Control System 1 Set
8 Cooling Bracket with Lengthways Cutting Device 1 Set
9 Haul-Off Unit 1 Set
10 Coiler 1 Set
11 Electric Control System 1 Set
TJ-700 Adhesive Coating Production Line
No. Equipment Name Quantity
1 Unpowered Uncoil Device (Separate Uncoiler Optional) 2 Sets
2 PE Backing Stretching Unit 1 Set
3 300L Reactor 1 Set
4 Adhesive Coating Roller 1 Set
5 Cooling Water Tank 1 Set
6 Haul-Off Unit 1 Set
7 Digital Meter Counter 1 Set
8 Coiler 1 Set
9 Electric Control System 1 Set
Core Production Process
Standard Three-Step Forming Process
1. Substrate Extrusion: LDPE extrusion line produces high-purity PE backing film with uniform thickness
2. Irradiation Crosslinking: A professional electron accelerator irradiates the substrate to endow flame retardancy and high tensile strength
3. Online Lamination: Secondary stretching shaping, then real-time bonding with imported special hot melt adhesive, ensuring high peel strength and qualified shrinkage rate
Three-Layer Fiberglass Reinforced Process

Adds fiberglass unwinding, heating, and leveling steps on the standard process, realizes one-pass continuous forming of three-layer fiber-reinforced products, with higher strength and better shrinkage performance.

Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 4 Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 5
Our Advantages
High Efficiency & Low Consumption: Innovative single-screw extruder with direct-connection technology, low energy consumption, high output, long service life, maximizes production profit
Intelligent Control:  PLC control system, ABB main motor, controllable production speed, fully automated operation, and reduces labor costs
Stable Product Quality: Advanced T-shaped molds and coat hanger-style flow channels, high-precision mirror rollers, and patented secondary stretching equipment ensure uniform substrate thickness and low scrap rate
Multifunctional Production: One set of equipment can produce various heat-shrinkable tape and sleeve products, avoiding redundant equipment investment
Premium Configuration: Adopts top-brand electrical components, imported high-quality adhesive raw materials (DuPont, Sumitomo, Hanwha), stable performance, low failure rate
Industry Leading Technology: Three-layer one-pass molding technology, reaching world-class level in equipment structure, vulcanization and product performance
Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 6
Core Test Parameters

Meet ASTM, DIN, GB/T International Standards

Adhesive Softening Point: 70-80°C (ASTM E 28)
Shear Strength: ≥100N/cm (DIN 30 672)
Tensile Strength: 15-20Mpa (ASTM D638)
Elongation at Break: 350%
Peel Strength: >150N/cm (ASTM D1000)
Water-Intake Rate: 0.05% (ASTM D570)
Company Profile

Qingdao Huashida Machinery is a professional manufacturer of heat shrinkable tape production lines, pipe anti-corrosion equipment, and plastic machinery with over 20 years of industrial manufacturing experience.

We have 9 senior engineers, a national high-end plastic machinery expert workstation, and 389 sets of successful global project application cases. Our heat-shrinkable tape and sleeve production lines are exported to dozens of countries and regions worldwide, and we fully support customized production solutions to meet diverse customer requirements across output, product types, and pipeline applications.

Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 7 Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 8
Commercial Terms
Payment Terms
  • 30% of the contract amount as a deposit within 2 working days after contract signing
  • 67% of the contract amount before goods delivery
  • 3% of the contract amount within 10 days after finishing installation and commissioning
After-Sales Service & Warranty
  • Warranty Period: 12 months for mechanical parts, 6 months for electrical parts from the date of equipment receipt
  • Free Services: Free technical documents, electrical drawings, and on-site operator training
  • Installation & Commissioning: Professional technicians dispatched for on-site guidance; buyer covers round-trip tickets, accommodation, transportation, insurance, and USD 150 per person per day allowance
  • Long-term Support: Lifetime technical consultation, spare parts supply, and after-sales troubleshooting
Delivery
Delivery Time

Production and delivery are completed within 90 days after receiving the deposit

Packaging & Shipping

Standard packaging with wrap film; wooden pallets or cartons are available at the buyer's cost

Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 9
International Exhibition
Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 10
Certifications
Cross-Linked HDPE Heat Shrink Sleeve Line Production line for Oil Gas Pipeline 11
Ratings & Review

Overall Rating

5.0
Based on 50 reviews for this supplier

Rating Snapshot

The following is the distribution of all ratings
5 stars
100%
4 stars
0%
3 stars
0%
2 stars
0%
1 stars
0%

All Reviews

F
Frank
Australia Apr 17.2026
Thank You Huashida
Recommended Products
Get in touch with us
Contact Person : Mr. Lily
Tel : +8615969839906
Fax : 86-532-80999083
Characters Remaining(20/3000)