The epoxy powder anti-corrosion process for the inner and outer walls of steel pipes is currently an efficient and reliable solution for pipeline anti-corrosion. The treated steel pipe has significant advantages: its coating not only has excellent corrosion resistance, capable of resisting the long-term erosion of various chemical media such as acids, alkalis, and salts, but also has a smooth and dense surface structure, which can effectively reduce the frictional resistance during fluid transportation and improve the transmission efficiency of the pipeline. This type of anti-corrosion steel pipe, with its outstanding comprehensive performance, is widely used in multiple key fields such as long-distance oil and gas pipelines, urban water supply and drainage networks, and industrial fluid transportation.
![]()
Internal & External FBE Powder Coating
Main equipment:
![]()
√ Set up a domestic high-end plastic machinery expert workstation, with more than 10 patented technologies
√ 9 senior engineer team, refined FBE powder curing parameters, and 3LPE interlayer bonding process
√ 4000 m2 intelligent factory, strict implementation of the ISO9001 quality control system
√ 100% test run before the equipment leaves the factory, the operation stability reaches 99.8%
√ Set research and development, production in one, to ensure the technology and equipment performance
Question & Answer:
Q1. What is the size of the pipe diameter? Can your equipment produce?
A: We can produce four main models:
Diameter of steel Pipe:
325-1820 mm
508-2540 mm
508-1620 mm
1000-3600 mm
508-4200 mm
Q2. What is the Descaling grade?
A: SA2.5?
Q3. What is your anticorrosion coating standard?
A: It can meet SY/T0413-2002, GB/T23257-2009, German DIN 30670, DIN 30678, and coating specification requirements from American Corrosion Association, and DNV. The product pipe fully complies with SY/T0315-2005, CNPC38-2002 "Technical specifications for double-layer fusion-bonded epoxy powder coating on buried steel pipe and the Canadian American Corrosion Association standards.
Q4. What is the Delivery Time
A: 2-3 months after deposit.
Q5. Production output:
A: It is different output capability as different pipe diameters; the Max is 3 to 8 km/day, and the annual processing capacity is 2 million square meters (Φ508 mm).
Q6. Coating thickness:
A: 80~800um
Q7. Which country did you sell your 3PE equipment to?
A. We have produced nearly 50 sets of 3PE processing lines at home and abroad. Such as Russia, Iran, UAE, Iran, India, Belarus, Kazakhstan, and so on.
Q8. After-sales service:
A: Warranty period:
Before delivery, all the equipment must be trial-operated to confirm the quantity perfectly.
The warranty period is 12 months from the date of pick-up for the mechanical part, and 6 months for the electrical part. The seller provides free technical services and provides training and guidance to buyer operators.
![]()
![]()
![]()
![]()