logo

3LPE Coating Pipe Production Line Supporting Steel Pipe Surface Treatment with Shot Blasting and Durable Anti Corrosion Coating Application

1
MOQ
235000$ - 353000$
Price
3LPE Coating Pipe Production Line Supporting Steel Pipe Surface Treatment with Shot Blasting and Durable Anti Corrosion Coating Application
Features Gallery Product Description Request A Quote
Features
Specifications
After-sales Service: Overseas Installation, Free Technical Supporting
Warranty: 12 Months
Type: Coating Production Line
Coating: Powder Coating
Substrate: Steel
Condition: New
Transport Package: Standard Package For Export
Specification: 325-4200mm
Clean Level: >=SA2.5
Coating Material: FBE Powder
Coating Layer: Internal & External Pipe Wall
Output Speed: 0-6m/Min
Coating Thickness: 150-800um
Pipe Diameter: 325-4200mm
Highlight:

3LPE coating pipe production line with shot blasting

,

steel pipe surface treatment for anti corrosion

,

durable 3LPE coating application equipment

Basic Infomation
Place of Origin: Qingdao, China
Brand Name: Huashida
Certification: CE, ISO, RoHS
Model Number: 325-4200mm
Payment & Shipping Terms
Packaging Details: 1200*230*260
Delivery Time: 70-90 Days
Payment Terms: L/C,T/T,Western Union
Supply Ability: 30 Unit/Year
Product Description
3LPE Coating Pipe Production Line
Product Overview

This TPEP Steel Pipe FBE 3LPE Anti-Corrosion Coating Line is a fully automatic integrated steel pipe anti-corrosion coating machinery specially built for factory anti-corrosion treatment of large diameter steel pipes. It supports multi-layer coating processes including FBE single layer, 2LPE, 2LPP and 3LPE anti-corrosion coating, widely used in oil gas pipeline, oilfield engineering, central heating, municipal water supply and buried pipeline construction projects.

Complete System Integration

This complete 3LPE coating line integrates internal external shot blasting derusting, intermediate frequency induction heating, electrostatic FBE powder spraying, hot melt adhesive extrusion, outer PE cladding, water spray cooling, pipe end beveling and full PLC automatic control system. It realizes one-time synchronous forming of internal FBE epoxy layer, middle adhesive layer and external 3LPE polyethylene protective layer, meeting international anti-corrosion standards and ideal for long-distance buried steel pipe protection.

Coating Technology

FBE epoxy powder coating adopts non-toxic thermosetting raw materials. After high-temperature curing, it forms a high-molecular cross-linked dense protective structure with outstanding chemical anti-corrosion, wear resistance, anti-aging and mechanical strength. The FBE base layer closely bonds with steel pipe surface, delivering excellent adhesion, acid alkali resistance and cathodic disbondment resistance.

The middle polymer adhesive layer perfectly combines with uncured epoxy powder, then tightly covers the outer polyethylene layer, forming a stable three-layer anti-corrosion system - the core technical advantage of professional buried pipe anti-corrosion equipment.

Key Features
  • Premium Anti-Corrosion Performance - Professional internal external FBE coating protects steel pipes against chemical erosion, aging and mechanical damage; suitable for long-term operation in harsh oilfield, underground and coastal environments.
  • Low Friction Pipeline Performance - Smooth coating surface reduces fluid transmission resistance, improves conveying efficiency and cuts long-term energy cost for oil gas and water supply pipeline systems.
  • Wide Industry Application - The preferred 3LPE anti-corrosion solution for oil & gas transmission, urban gas supply, municipal water drainage, heating network and large infrastructure buried pipe projects.
  • High Automation & Cost Saving - Full automatic running design lowers labor input, stable operation reduces failure rate, making it cost-effective pipe coating machinery for manufacturers.
Equipment Visuals
3LPE Coating Pipe Production Line Supporting Steel Pipe Surface Treatment with Shot Blasting and Durable Anti Corrosion Coating Application 0 3LPE Coating Pipe Production Line Supporting Steel Pipe Surface Treatment with Shot Blasting and Durable Anti Corrosion Coating Application 1 3LPE Coating Pipe Production Line Supporting Steel Pipe Surface Treatment with Shot Blasting and Durable Anti Corrosion Coating Application 2
Main Equipment Components
No. Name Set
A. Derusting Equipment
1Pipe-conveying Equipment1
2Shot Blast Cleaning Machine1
3Cyclone Dust Collector1
4Pulse dust collector1
5Centrifugal exhaust fan1
6Rust removal equipment PLC1
B. Coating equipment
1Coating transfer equipment1
2IF heating device1
3Powder spraying device1
4Automatic loading dryer2
5SJ-65/30 Extruder1
6SJ-180/30 Extruder1
7Hot melt adhesive extruder die1
8PE sheet extruder head mold1
9Hot melt adhesive/PE sheet coating device1
10Environmental Protection Ventilation equipment1
11Cooling Spray equipment1
C. Platform Equipment
1Steel pipe platform1
2Post-rust removal transition platform1
3Product tube storage platform1
4Hydraulic Equipment3
D. Groove Equipment
1PE Beveling Machine2
2Hydraulic Lifting and Turning Machinery1
3Hydraulic Equipment1
4PLC1
E. Compressed air Equipment
1Screw Air Compressor1
2Cold dry machine1
3Precision filters3
4Gas tanks1
3LPE Coating Pipe Production Line Supporting Steel Pipe Surface Treatment with Shot Blasting and Durable Anti Corrosion Coating Application 3
Technical Specifications
What are the production line parameters?
(1) Steel pipe coverage: Φ325-1200mm, Φ325-1620mm, Φ325-1820mm, Φ508-1620mm, Φ508-2540mm, Φ508-3600mm; (2) Processing capacity: ≤250m²/h; (3) Cleaning level: Sa2.5; (4) Materials used: dissolved epoxy resin powder.
What is the coating thickness?
80-800 μm (customizable according to customer requirements).
What is the delivery time?
2-3 months after the confirmation of the deposit.
What is the warranty period?
12-month mechanical warranty / 6-month electrical warranty.
Process Flexibility

Flexible to support single-layer FBE spraying or composite 3LPE coating; compatible with outer 3LPE + internal FBE combined structure, fully adapting to civil water supply, long-distance oil gas transportation, heating pipeline and multiple engineering scenarios.

Performance & Environmental Compliance

Precise intermediate frequency heating system reaches ±2°C temperature accuracy, ensuring uniform epoxy powder melting and firm coating adhesion. Adjustable spiral conveyor speed fits different large diameter steel pipes, keeping stable processing capacity and consistent anti-corrosion quality.

Equipped with professional dust collector and powder recovery system, fully compliant with CE & ISO14001 environmental standards. Zero dust pollution meets global factory environmental requirements for steel pipe derusting and coating production.

Global Service Network

We have completed more than 50 projects at home and abroad, with our equipment installed and put into use in countries such as Russia, Iran, the United Arab Emirates, India, Belarus, and Kazakhstan, gaining wide recognition from global clients.

Service Scope
  • Pre-sale: Provide free workshop planning and capacity measurement schemes
  • Sale: On-site guidance by engineers, installation and commissioning, and free training
  • After-sales: 24-hour remote technical support
Recommended Products
Get in touch with us
Contact Person : Mr. Lily
Tel : +8615969839906
Fax : 86-532-80999083
Characters Remaining(20/3000)