logo

Automated 3LPE Coating Pipe Production Line with SA 2.5 Surface Treatment and Polyethylene Coating

1
MOQ
US$100,000.00 - 3,000,000.00
Price
Automated 3LPE Coating Pipe Production Line with SA 2.5 Surface Treatment and Polyethylene Coating
Features Gallery Product Description Request A Quote
Features
Specifications
Screw: Single Screw
Pipe Surface Treatment: No Less Than SA 2.5
Operating Mode: Automatic
Coating Materials: Polyethylene, Polypropylene
Highlight:

Automated 3LPE Coating Pipe Production Line

,

SA 2.5 Surface Treatment Steel Pipe Anti-Corrosion Coating Line

,

Polyethylene Coating FBE Primer Adhesive PE Outer Layer

Basic Infomation
Place of Origin: Qingdao ,China
Brand Name: Huashida
Certification: CE, Rohs,TUV
Model Number: 110-2000mm
Payment & Shipping Terms
Packaging Details: Container loading,sea transportation
Delivery Time: 60days
Payment Terms: L/C,T/T
Supply Ability: 5-10 +sets+per mouth
Product Description
3LPE Steel Pipe Coating Production Line FBE Primer Adhesive PE Outer Layer
Product Description

The Huashida 3LPE/FBE Steel Pipe Anti-Corrosion Coating Line is a comprehensive, fully automated solution for applying high-performance protective layers to steel pipelines. This complete system integrates advanced shot blasting, precision intermediate-frequency heating, electrostatic powder spraying, and O-type co-extrusion technology for PE and adhesive applications.

Engineered for extreme environments, the 3LPE-coated pipes produced on this line offer superior resistance to chemical degradation, acids, bases, and salt solutions. This ensures maximum stability and an extended service life for critical infrastructure in oil and gas transmission, municipal water management, and industrial fluid transportation.

3LPE Steel Pipe Coating Production Line

Technological processes

Our streamlined workflow ensures uniform coating thickness and high-speed output:

  1. Pipe Loading: Automated upload via screw conveyor.

  2. Surface Treatment: Professional rust removal (Sa2.5) via shot blasting.

  3. Induction Heating: Precision intermediate frequency heating for optimal coating adhesion.

  4. FBE Coating: Electrostatic Epoxy powder spraying.

  5. 3LPE/2LPE Application: O-Type co-extrusion of adhesive and polyethylene layers.

  6. Cooling & Finishing: Water spray cooling followed by automated pipe end grinding/beveling.

  7. Unloading: Systematic discharge for storage and transport.

Our Advantages
  • Cutting-edge technology: Innovative processes enhance efficiency
  • All-weather stable operation: Failure rate <0.5%
  • Automated production lines: Labor costs have dropped by over 40%
  • International Anti-corrosion Certification (ISO/CE)
  • Full-process service: design → installation → commissioning → training
  • Technical support for the expert workstation of high-end plastic machinery and equipment

    International Trading show

    Rubber Foam Sponge Tube Production Line / Air Conditioning Insulation Sheet Production Line / Rubber Insulation Pipe Production Line

    Certifications

    Rubber Foam Sponge Tube Production Line / Air Conditioning Insulation Sheet Production Line / Rubber Insulation Pipe Production Line



    Our Team


    Rubber Foam Sponge Tube Production Line / Air Conditioning Insulation Sheet Production Line / Rubber Insulation Pipe Production Line
Recommended Products
Get in touch with us
Contact Person : Ms. yuki
Tel : +8615953227920
Fax : 86-532-80999083
Characters Remaining(20/3000)