logo

Customizable 3LPE Coating Pipe Production Line for Advanced and Precise Pipe Coating

1 Set
MOQ
$US100000-3000000
Price
Customizable 3LPE Coating Pipe Production Line for Advanced and Precise Pipe Coating
Features Gallery Product Description Request A Quote
Features
Specifications
Heating Method: Induction Heating
Coating Structure: Fbe, 2lpe, 3lpe
HS Code: 8477209000
Application: Water/Gas/Oil Supply
Coating: Powder Coating, Extrusion Coating
Plc: Siemens
Basic Infomation
Brand Name: Huashida
Certification: ISO/CE/RoHS
Model Number: 50-4200mm
Payment & Shipping Terms
Packaging Details: Standard Package For Export
Delivery Time: 60 Days
Payment Terms: TT/LC/DP
Supply Ability: 30 Set/year
Product Description

Product Description:

3LPE Steel Pipe Coating Production Line
Product Overview:
The 3LPE (Three-Layer Polyethylene) Steel Pipe Coating Production Line by Qingdao Huashida Machinery Co., Ltd. is engineered for high-performance anti-corrosion coating of steel pipes. This line supports pipe diameters ranging from 159mm to 1400mm, with an extrusion capacity up to 350 kg/h, customizable to specific production requirements.
Customizable 3LPE Coating Pipe Production Line for Advanced and Precise Pipe Coating 0
This advanced production line is the result of years of dedicated development and innovation, fulfilling the increasing market demand for durable, efficient, and high-performance anti-corrosion solutions.

3-Layer PE Coating System Composition:
The 3LPE anti-corrosion coating system comprises:
1. Fusion-Bonded Epoxy (FBE) Primer Layer
- Thermosetting, non-toxic coating that cures into a high molecular weight, cross-linked structure.
- Provides excellent chemical corrosion resistance and superior adhesion.
2. Polymer Adhesive Middle Layer
- Typically a polyolefin copolymer (e.g., vinyl copolymer) that chemically bonds with both the epoxy primer and polyethylene top layer.
3. Polyethylene (PE) Top Layer
- Ensures high mechanical protection and environmental resistance, ideal for buried pipelines.

This 3-layer coating structure ensures superior adhesion, excellent mechanical strength, and long-lasting anti-corrosion performance, making it widely used in oil & gas pipelines, urban gas distribution, and water transmission lines.

Technical Process Flow:
1. Pipe Loading
2. Screw Conveyor Transfer
3. Surface Cleaning & Induction Heating
4. Epoxy Powder Coating
5. Adhesive and Polyethylene Extrusion Coating
6. Cooling Spray Treatment
7. Pipe Unloading & Grinding

Key Specifications:
- Pipe Diameter Range: 159mm - 1400mm
- Extrusion Output: ≤350 kg/h
- Application: Steel pipe external anti-corrosion coating for buried pipeline systems

Customizable 3LPE Coating Pipe Production Line for Advanced and Precise Pipe Coating 1

Applications:

Application

The three-layer PE process, with the epoxy powder coating as bottom layer, binding and bundling through polyethylene PE and adhesive, is widely used in anticorrosion of steel pipes, and applied to the oil, natural gas, chemical material, water pipelines.

Question & Answer:

Q1. What is Size of Pipe Dia. your equipment can produce ?
A: We can produce four main Model: Diameter of steel Pipe:48-219mm, 219-1220mm, 800-1600mm, 1000-2400mm

Q2. What is Descaling grade?
A: SA2.5

Q3. What is your anticorrosion coating standard?
A: It can meet SY/T0413-2002, GB/T23257-2009, German DIN 30670, DIN 30678 and coating specification requirements from American Corrosion Association, and DNV. The product pipe fully complies with SY/T0315-2005, CNPC38-2002 "Technical specifications for double-layer fusion-bonded epoxy powder coating on buried steel pipe and Canada, American Corrosion Association standards

Q4. What is Delivery Time
A: 2-3 months after deposit

Q5. Production output
A: It is different output capability as different pipe diameter, the Max. is 3 to 8 km/day, and annual processing capacity is 2 million square meters (Φ508 mm)

Q6. Coating thickness:
A: 80~800um

Q7. Which country did you sell your 3PE equipment?
A: We have produced nearly 50 sets 3PE processing line at home and abroad. Such as Russia, Iran, UAE, Iran, India, Belarus, Kazakhstan and so on.

Q8. After-sales service:
A: Warranty period: Before delivery all the equipment must be trial operated to confirm the quantity perfectly. The warranty period is 12 months from the date of pick-up for mechanical part, and 6 months for the electrical part.
Service: The seller provides technical services and provides training and guidance to buyer operators.

Customizable 3LPE Coating Pipe Production Line for Advanced and Precise Pipe Coating 2


Customization:

Product Customization Services:

Brand Name: Huashida

Model Number: 50-4200mm

Place Of Origin: Qingdao

Certification: ISO/CE/RoHS

Minimum Order Quantity: 1 Set

Price: $US100000-3000000

Packaging Details: Standard Package For Export

Delivery Time: 60 Days

Payment Terms: TT/LC/DP

Supply Ability: 30 Set/year

Coating: Powder Coating, Extrusion Coating

Coating Type: Internal, External

Computerization: Computerized

Plc: Siemens

Origin: China


Support and Services:

The Product Technical Support and Services for the 3LPE Coating Pipe Production Line include:

- Installation guidance and support

- Training on how to operate the production line efficiently

- Troubleshooting assistance for any technical issues

- Regular maintenance services to ensure optimal performance


FAQ:

Q: What is the brand name of the 3LPE Coating Pipe Production Line?

A: The brand name is Huashida.

Q: What is the model number of the 3LPE Coating Pipe Production Line?

A: The model number is 50-4200mm.

Q: Where is the 3LPE Coating Pipe Production Line manufactured?

A: The production line is manufactured in Qingdao.

Q: What certifications does the 3LPE Coating Pipe Production Line have?

A: The production line is certified with ISO, CE, and RoHS.

Q: What is the minimum order quantity for the 3LPE Coating Pipe Production Line?

A: The minimum order quantity is 1 set.