logo

Steel Pipe 3PE Fbe Three Layer PE Steel Pipe Internal External Anti Corrosion Coating Line

1
MOQ
Steel Pipe 3PE Fbe Three Layer PE Steel Pipe Internal External Anti Corrosion Coating Line
Features Gallery Product Description Request A Quote
Features
Specifications
Spiral Conveyor: Steel Wheel
IF Heating Power Supply: 750KW
IF Coil: Adapt To 159-325 Pipe Diameter
Stainless Steel Powder Room: Material 304 Stainless Steel
Hydraulic Pressure Station: 11Kw
Epoxy Powder Coating Cabinet: Spray Gun*8
Highlight:

3lpe Coating Process Pipe Production Line

,

China 3lpe Coating Pipe Production Line

,

Three Layer Polyethylene Pipe Production Line

Basic Infomation
Place of Origin: Qingdao,Shandong,China
Brand Name: HUASHIDA
Certification: ISO9001
Payment & Shipping Terms
Packaging Details: Packing according to Machine
Delivery Time: come to an agreement in respect of the delivery time
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Product Description

Steel Pipe 3PE Fbe Three Layer PE Steel Pipe Internal External Anti Corrosion Coating Line
 
 
Description
 
3PE Anticorrosion coating processing line is to make 3 layer anti-corrosion coating for kinds of steel pipes.
3 layer coatings, first FBE coating, middle is adhesive layer, outside polyethylene layer.

 

3PE can strengthen the pipeline's mechanical properties, high electrical resistance, waterproof, wearable, anti-aging.


3PE coating/coated steel pipes are widely used in pipeline systems for the transmission of oil, gas, water and other fluids. They have highly resistance to corrosive from chemicals, moisture, harmful environment etc.
 

The line includes systems of steel pipe transportation, surface disposal, dust catching, pipe heating, electrostatic spraying, coating, water cooling, edge cutting, hydraulic and pneumatic device, detecting and electric controlling system.


Main Equipment List

No. Name Set
A. Derusting Equipment
1 Pipe conveyor 1
2 Shot Blasting machine 1
3 Cyclone Dust Collector 1
4 Catridge dust collector 1
5 Centrifugal exhaust fan 1
6 PLC control system 1
B. Coating equipment
1 Conveyor 1
2 Heating device 1
3 Powder spraying device 1
4 Cooling Spray equipment 1
C.Platform
1 Steel pipe platform 1
2 Post-rust removal transition platform 1
3 Hydraulic Equipment 3

 
Our Services
Quality guarantee period:12 months or 14 months from date of Bill of Lading.
During this period, the seller will provide free service for all problems caused by quality of equipments, however except the problems caused by the buyer .because of wrong operation.
Service:The seller would send technician to the buyer's factory to test the new machine and train people of the buyer. The buyer should pay for round-trip transportation expense, food, accommodation, insurance locally and related salary.
 

 
 
Steel Pipe 3PE Fbe Three Layer PE Steel Pipe Internal External Anti Corrosion Coating Line 0Steel Pipe 3PE Fbe Three Layer PE Steel Pipe Internal External Anti Corrosion Coating Line 1
Steel Pipe 3PE Fbe Three Layer PE Steel Pipe Internal External Anti Corrosion Coating Line 2Steel Pipe 3PE Fbe Three Layer PE Steel Pipe Internal External Anti Corrosion Coating Line 3Steel Pipe 3PE Fbe Three Layer PE Steel Pipe Internal External Anti Corrosion Coating Line 4

Recommended Products
Get in touch with us
Tel : 15764286995
Fax : 86-532-80999083
Characters Remaining(20/3000)