logo

Oil Gas Pipline Steel Pipe 3lpe 2lpe Fbe External Internal Coating Machine

1
MOQ
Oil Gas Pipline Steel Pipe 3lpe 2lpe Fbe External Internal Coating Machine
Features Gallery Product Description Request A Quote
Features
Specifications
Place: Indoor
Power: No Danger Zone
Moisture: 85% No Condensation
Cooling Water Recycling: ≤15℃,0.15-0.2МПа,0.5м³/мин
Extrusion Process: Multi-Layer Extrusion
Highlight:

3lpe Coating Process Pipe Production Line

,

China 3lpe Coating Pipe Production Line

,

Three Layer Polyethylene Pipe Production Line

Basic Infomation
Place of Origin: Qingdao,Shandong,China
Brand Name: HUASHIDA
Certification: ISO9001
Payment & Shipping Terms
Packaging Details: Packing according to Machine
Delivery Time: come to an agreement in respect of the delivery time
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Product Description

Oil Gas Pipline Steel Pipe 3lpe 2lpe Fbe External Internal Coating Machine

 

 

Description

Steel pipe anti-corrosion coating production line is used for anti-corrosion coating steel pipe with diameter from 57mm to 1220mm, which are widely used in varieties of engineering construction, especially in the heating, gas, oil industry.
This line can be applied to FBE, 2 layer FBE, 2 layer PE, 2 layer PP, and 3 layer PE anti-corrosion coating.

 

3 layer PE anti-corrosion coating consists of first FBE coating, a middle adhesive layer, and an outer polyethylene layer.
The three-layer polyethylene anti-corrosion coating is an advanced technology as the outer protective layer of buried pipe, widely used in the anti-corrosion of gas and oil transmission pipeline, urban gas supply, water supply pipe, and other fluid transmission pipelines. 3 layer PE anti-corrosion coating can strengthen the pipeline's mechanical properties with high electrical resistance, waterproof, wearable, and anti-aging performance.
 

Layer thickness
C kg/mKlasa A1Klasa A2Klasa A3Klasa B1Klasa B2Klasa B3Klasa C1Klasa C2Klasa C3
≤151,82,12,61,31,82,31,31,72,1
15≤C ≤502,02,43,01,52,12,71,51,92,4
50≤C ≤1302,42,83,51,82,53,11,82,32,8
130≤C ≤3002,63,23,92,22,83,52,22,53,2
300 < C3,23,84,72,53,34,22,53,03,8


Technological processes
Upload pipespipes screw conveyorrust removal of intermediate frequency heatingEpoxy powder coatingouter layer soli quid & polyethylene coatingcooling spraypipes screw conveyorgrinding pipes, sendunload pipes

 

Main Equipment List

No. Name Set
A. Derusting Equipment
1 Pipe-conveying Equipment 1
2 Shot Blast Cleaning Machine 1
3 Cyclone Dust Collector 1
4 Pulse dust collector 1
5 Centrifugal exhaust fan 1
6 Rust removal equipment PLC 1
B. Coating equipment
1 Coating transfer equipment 1
2 IF heating device 1
3 Powder spraying device 1
4 Automatic loading dryer 2
5 SJ-65/30 Extruder 1
6 SJ-180/30 Extruder 1
7 Hot melt adhesive extruder die 1
8 PE sheet extruder head mold 1
9 Hot melt adhesive/PE sheet coating device 1
10 Environmental Protection Ventilation equipment 1
11 Cooling Spray equipment 1
C.Platform Equipment
1 Steel pipe platform 1
2 Post-rust removal transition platform 1
3 Product tube storage platform 1
4 Hydraulic Equipment 3
D.Groove Equipment
1 PE Beveling Machine 2
2 Hydraulic Lifting and Turning Machinery 1
3 Hydraulic Equipment 1
4 PLC 1
E.Compressed air Equipment
1 Screw Air Compressor 1
2 Cold dry machine 1
3 Precision filters 3
4 Gas tanks 1

Oil Gas Pipline Steel Pipe 3lpe 2lpe Fbe External Internal Coating Machine 0Oil Gas Pipline Steel Pipe 3lpe 2lpe Fbe External Internal Coating Machine 1

Oil Gas Pipline Steel Pipe 3lpe 2lpe Fbe External Internal Coating Machine 2Oil Gas Pipline Steel Pipe 3lpe 2lpe Fbe External Internal Coating Machine 3Oil Gas Pipline Steel Pipe 3lpe 2lpe Fbe External Internal Coating Machine 4

Recommended Products
Get in touch with us
Tel : 15764286995
Fax : 86-532-80999083
Characters Remaining(20/3000)