| Specification | Pipe Dia. 300-4200mm |
|---|---|
| Workshop Space | 100m X 24m |
| Coating Thickness | 150-800um |
| Output Speed | 0-6m/Min |
| Coating | Powder Coating |
| Inner Pipe Material | Steel/HDPE/PEX |
|---|---|
| Transport Package | Packing Film, Wooden Case |
| Voltage | 220V/380V |
| Coating Thickness | 50-100mm |
| Outer Jacket Material | High Density Polyethylene (HDPE) |
| Manufacturer | Qingdao Huashida Machinery Co., Ltd. |
|---|---|
| Control System | PLC |
| Coating Layer | Internal&External Pipe Wall |
| Clean Level | >=SA2.5 |
| Corrosion Resistance | High |
| Coating | Powder Coating |
|---|---|
| PE Layer Thickness | 2.5 - 3.7 Mm |
| Curvature Radius | 4-6 Times D |
| Elbow Angle | 15-90 Degrees |
| Specification | Pipe Dia. 426-820mm |
| Power Supply | 380V/50Hz |
|---|---|
| Production Capacity | 1000 Meters Per Day |
| Total Power | 150kw |
| Insulation Material | Polyurethane Foam |
| Pipe Material | Steel |
| Coating Layers | 3 Layers |
|---|---|
| Welding Method | Submerged Arc Welding |
| Operation Mode | Automatic |
| Production Range | 170mm |
| Corrosion Resistance | High |
| Coating Type | 3LPE (3-Layer Polyethylene) |
|---|---|
| Production Range | 426mm |
| Pipe Diameter | 219-1422mm |
| Welding Method | Submerged Arc Welding |
| Pipe Length Range | 6-12 Meters |
| Transport Package | Standard Package |
|---|---|
| Application | For Producing Pre-Insulated Pipe Jacket |
| Specification | 110-2200mm |
| Raw Material | PE |
| Calibration Method | Vacuum And Water Spraying Cooling |
| Head Type | Round |
|---|---|
| Application | Insulation Pipe |
| Thickness | 2-18mm |
| Packaging Details | Standard Package |
| Delivery Time | 60days |
| Coating | Powder Coating |
|---|---|
| Spray Method 1 | Electrostatic Spray |
| Spray Method 2 | Simultaneous Inner Outer Wall Coating |
| Specification | 300-4200mm |
| Powder Recovery Rate | ≥98% |