| Head Type | Round |
|---|---|
| Usage | Weld HDPE Pipe |
| Applicationpipeline Joint Closure | Pipeline Joint Closure |
| Packaging Details | Standard Package |
| Delivery Time | 60days |
| Coating | Powder Coating |
|---|---|
| Spray Method 1 | Electrostatic Spray |
| Spray Method 2 | Simultaneous Inner Outer Wall Coating |
| Specification | 300-4200mm |
| Powder Recovery Rate | ≥98% |
| Power | 380V/50Hz |
|---|---|
| Color | Customized |
| Material | Rubber Foam |
| Automation | Fully Automatic |
| Production Capacity | 500-1000kg/h |
| Computer System | Full Auto |
|---|---|
| Automation | Automatic |
| Cutting Size | 110-2200mm |
| Specification | HDPE Pipe |
| Packaging Details | Standard Package |
| Screw | Single-Screw |
|---|---|
| Product Type | HDPE Pipe |
| Crawler Lengh | 2.5m Effective Length |
| Clamping Type | Hydraulic Clamps |
| Crawler Feet | 2-12 Feet |
| Power | 380V/50Hz |
|---|---|
| Color | Customized |
| Material | Rubber Foam |
| Automation | Fully Automatic |
| Production Capacity | 500-1000kg/h |
| Customized | Customized |
|---|---|
| Application | Producing Pre-Insulated Pipe Jacket |
| HS Code | 8477209000 |
| Packaging Details | Standard Pakage |
| Delivery Time | 60 Days |
| Diameter Ranging | Φ32 To Φ426mm |
|---|---|
| Material | PE |
| Applications | Gas Supply Pipe/Heating Supply Pipe |
| Packaging Details | Standard Package |
| Delivery Time | 60days |
| Pipe Diameter | 110-2200mm Or Customized |
|---|---|
| Raw Material | HDPE |
| Use For | Central Heating, Cooling Oil & Gas Transmission |
| Application | For Producing Pre-Insulated Pipe Jacket |
| Calibration Method | Vacuum Calibration And Water Spraying Cooling |
| Application | Produce District Heat Distribution Pipe |
|---|---|
| Screw | Solid-Liquid Separation Screw |
| Setting Box | Vacuum Setting |
| Turkkey Project | Provided |
| Loading Way | Vacuum Automatic Feeding |