| Condition | New |
|---|---|
| Material | PE/PUR |
| Control System | PLC |
| Heating Method | Electric Heating |
| Humidity | 85% Non Condensing |
| Condition | New |
|---|---|
| Material | PE/PUR |
| Control System | PLC |
| Heating Method | Electric Heating |
| Humidity | 85% Non Condensing |
| Specification | PE-910 |
|---|---|
| Main Extruder | 130 |
| Pipe Diameter (mm) | 1160mm |
| Capacity (kg/h) | 600kg/h |
| Packaging Details | according to the actual condition |
| Specification | PE-910 |
|---|---|
| Main Extruder | 130 |
| Pipe Diameter (mm) | 1160mm |
| Capacity (kg/h) | 600kg/h |
| Packaging Details | according to the actual condition |
| Packaging Details | according to the actual condition |
|---|---|
| Delivery Time | 2months |
| Payment Terms | T/T |
| Supply Ability | 20 sets per year |
| Place of Origin | China |
| Specification | PE-910 |
|---|---|
| Main Extruder | 130 |
| Pipe Diameter (mm) | 1160mm |
| Capacity (kg/h) | 600kg/h |
| Packaging Details | according to the actual condition |
| Specification | PE-910 |
|---|---|
| Main Extruder | 130 |
| Pipe Diameter (mm) | 1160mm |
| Capacity (kg/h) | 600kg/h |
| Packaging Details | according to the actual condition |
| Condition | New |
|---|---|
| Material | PE/PUR |
| Control System | PLC |
| Heating Method | Electric Heating |
| Humidity | 85% Non Condensing |
| Coating | 3-Layer PE Coating |
|---|---|
| Certification | ISO |
| Application | 3PE 2PE Fbe Anticorrosion Coating |
| Diameter Range | 50-426mm |
| PE Thickness | 2-3mm |
| Coating | 3-Layer PE Coating |
|---|---|
| Certification | ISO |
| Application | 3PE 2PE Fbe Anticorrosion Coating |
| Diameter Range | 50-426mm |
| PE Thickness | 2-3mm |