| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 60-90 days |
| Payment Terms | T/T,D/A,L/C |
| Supply Ability | 30 sets a year |
| Place of Origin | China |
| Board Layers | Multilayer |
|---|---|
| Automation | Automatic |
| Certification | ISO9001:2008 |
| Basing Tape Thickness | 0.2-1mm |
| Adhesive Coating Thickness | 0.1-0.5mm |
| Coating | Powder Coating |
|---|---|
| Type | Coating Production Line |
| Clean Level | >=SA2.5 |
| Heating Method | Medium-Frequency Heating System |
| Packaging Details | Wooden/Plastic Film |
| Pipe Range | 110-2000mm |
|---|---|
| Packaged | Wooden Cases And Pallets |
| Voltage | 380V 50Hz |
| Delivery Time | 40-60days |
| Usage | Water/Gas/Oil Supply Pipeline |
| Packaging Details | standerard package |
|---|---|
| Delivery Time | 60 days |
| Payment Terms | T/T |
| Supply Ability | 30 set/years |
| Place of Origin | China |
| Coating | 3-Layer PE Coating |
|---|---|
| Application | 3PE 2PE Fbe Anticorrosion Coating |
| PE Thickness | 2-3mm |
| Packaging Details | Plastic Film and Wooden Pallet |
| Delivery Time | 60DAYS |
| Pipe Diameter Range | 20-2000mm |
|---|---|
| Automation | Automatic |
| Packaging Details | Standard Export Package |
| Delivery Time | 60 days |
| Payment Terms | T/T |
| Pipe Diameter Range | 20-2000mm |
|---|---|
| Automation | Automatic |
| Packaging Details | Standard Export Package |
| Delivery Time | 60 days |
| Payment Terms | T/T |
| Type | Coating Production Line |
|---|---|
| Control System | PLC |
| Heating Method | Induction Heating |
| Surface Treatment Grade | ≥SA2.5 |
| Packaging Details | Standard Package for Export |
| Coating Type | Internal, External |
|---|---|
| Type | Coating Production Line |
| Surface Treatment Grade | ≥SA2.5 |
| Usuage | Derusting &Anticorrosion |
| Packaging Details | Standard Package for Export |