| 304 Powder Fluidized Box | Vibrating Screen With Power Recovery |
|---|---|
| Hot Melt Sheet Head Mold | Die Width 350 Mm |
| Vacuum Feeding Machine | Motor Power 7.5kw |
| Single Screw Extruder | Motor Power 45kw |
| Dust Removal Fan | Fan Power 5.5kw |
| Anticorrosion | Internal &External |
|---|---|
| Thickness | 3.5um-4.0um |
| Electrical Control System | Low Voltage Electrical Delixi |
| Steel Pipe Turning Machine | 3kw |
| PE Beveling Machine | Semi-closed Beveling Machine, Powder Does Not Fall To The Ground |
| Pipe Surface Treatment | Shot Blasting, Pickling, Phosphating |
|---|---|
| Location | Indoor |
| Anticorrosion | Internal &External |
| Pipe Surface Preparation | Shot Blasting |
| Motor | AC Or DC |
| Pipe Surface Treatment | Shot Blasting, Pickling, Phosphating |
|---|---|
| Location | Indoor |
| Pipe Surface Preparation | Shot Blasting |
| Pipe Material | Carbon Steel, Stainless Steel |
| Installed Capacity | 2700kw |
| Pipe Surface Treatment | Shot Blasting, Pickling, Phosphating |
|---|---|
| Location | Indoor |
| Pipe Surface Preparation | Shot Blasting |
| Pipe Material | Carbon Steel, Stainless Steel |
| Installed Capacity | 2700kw |
| Coating Type | PE Extrusion Coating |
|---|---|
| Coating Thickness | 1.8-4mm |
| Pipe Cleaning Method | Shot Blasting |
| Heating Method | Induction Heating |
| Cooling Method | Water Cooling |
| Heating Method | Medium-Frequency Heating System |
|---|---|
| Substrate | Steel |
| Coating | Powder Coating |
| Coating Material | Fbe Powder |
| Packaging Details | Standard Package |
| Type | Coating Production Line |
|---|---|
| Surface Treatment Grade | ≥SA2.5 |
| Substrate | Steel |
| Coating Structure | Fbe, 2lpe, 3lpe |
| HS Code | 8477209000 |
| Material | Steel |
|---|---|
| Type | Coating Production Line |
| Coating | PE |
| Condition | New |
| 3PE Structure | Epoxy+Adhesive+Extruded Polyethylene |
| Type | Coating Production Line |
|---|---|
| Substrate | Steel |
| Condition | New |
| Packaging Details | Plastic Film and Wooden Pallet |
| Delivery Time | 50-90 days |