| Pipe Surface Treatment | Shot Blasting, Pickling, Phosphating |
|---|---|
| Cooling Water | ≤15℃,0.15-0.2MPa,0.5m³/min |
| Usage | Making 3lpe Coating Pipe |
| Coating Material | Polyethylene, Adhesive, Epoxy |
| Cooling_Method | Water Cooling |
| Coating Thickness | 1.8-2.7mm |
|---|---|
| Control System | PLC Control |
| Pipe Length | 1-3m |
| Coating Type | 3LPE (Three Layer Polyethylene) |
| Pipe Diameter Range | Φ219-Φ1420mm |
| Coating Thickness | 1.8-2.7mm |
|---|---|
| Control System | PLC Control |
| Pipe Length | 1-3m |
| Coating Type | 3LPE (Three Layer Polyethylene) |
| Pipe Diameter Range | Φ219-Φ1420mm |
| Coating Thickness | 1.8-2.7mm |
|---|---|
| Control System | PLC Control |
| Pipe Length | 1-3m |
| Coating Type | 3LPE (Three Layer Polyethylene) |
| Pipe Diameter Range | Φ219-Φ1420mm |
| Screw No. | Single-screw |
|---|---|
| Automation | Automatic |
| Computerized | Computerized |
| Packaging Details | Standard Package |
| Delivery Time | 60DAYS |
| After-sales Service | Overseas Installation, Free Technical Supporting |
|---|---|
| Calibration Method | Vacuum And Water Spraying Cooling |
| Cutting Method | Dust-Free Planetary Cutting |
| Packaging Details | Standard Package |
| Delivery Time | 60DAYS |
| Cleaning Level | SA2.5 |
|---|---|
| Types | Polyurethane Foam Machine |
| Raw Material | PE |
| Automation | Automatic |
| Packaging Details | standard Package |
| Delivery Time | 45-90 days |
|---|---|
| Place of Origin | Qingdao,China |
| Brand Name | Huashida |
| Certification | CE, ISO |
| Delivery Time | 45-90 days |
|---|---|
| Payment Terms | T/T,D/P,D/A,L/C |
| Place of Origin | Qingdao,China |
| Brand Name | Huashida |
| Model Number | 508-4200 mm |
| Pipe Range | 48-3000mm |
|---|---|
| Anticorrosion Method | 3PE |
| Steel Pipe Outside | Shot Blasting |
| Material | PE/Epoxy Powder/Adhesive |
| Control System | PLC |