| Product Application | Air Conditioner Thermal Insulation |
|---|---|
| Heating Method | Electric Heating |
| Power | 380V/50Hz |
| Voltage | 380V |
| Power Supply | Customized |
| Features | High Efficiency, Energy Saving |
|---|---|
| Raw Material | Rubber, Chemicals |
| Feed Roll Diameter | 72MM |
| Processing Type | Extrusion |
| Power Source | Electricity |
| Dimension | 20m*2m*2m |
|---|---|
| Used Material | NBR&PVC A/C |
| Screw Diameter | 120MM |
| Condition | New |
| Control System | PLC Control |
| Application | Produce District Heat Distribution Pipe |
|---|---|
| Setting Box | Vacuum Setting |
| Loading Way | Vacuum Automatic Feeding |
| Standard | ASTM, GB, API, DIN |
| Foam Material | Polyurethane |
| Coating Thickness | 1.8-2.7mm |
|---|---|
| Control System | PLC Control |
| Bending AngleBending Angle | 15-90 Degrees |
| Coating Type | 3LPE (Three Layer Polyethylene) |
| PE Layer Thickness | 2.5-3.7mm |
| Advantage | High Speed, High Performance |
|---|---|
| Cutter | Automatically |
| Pipe Material | PP/PE/PVC |
| Key Word | High Speed |
| Application | Sewerage And Drainage In Municipal |
| Steel Pipe Diameter Range | 32mm - 426mm |
|---|---|
| Processing Capacity | ≤250㎡/h |
| Surface Cleaning Grade | Sa2.5 |
| Packaging Details | according to the actual condition |
| Delivery Time | 2months |
| Condition | New |
|---|---|
| Raw Material | PE |
| Application | Producing Pre-Insulated Pipe Jacket |
| Packaging Details | Standard Package |
| Delivery Time | 60days |
| Screw Channel Structure | Structure Deep Screw |
|---|---|
| Automation | Automatic |
| Total Power | 520kw |
| HS Code | 8468800000 |
| Packaging Details | Standard Package |
| Capability | 3-4unit/H |
|---|---|
| Foaming Thickness | 30-100mm |
| Raw Material | HDPE |
| Principle | High-Pressure Air Type |
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |