| Capability | 3-4unit/H |
|---|---|
| Foaming Thickness | 30-100mm |
| Raw Material | HDPE |
| Principle | High-Pressure Air Type |
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline |
| Model | HY-3LPE |
|---|---|
| Total Length | 80m |
| Total Weight | ≤2T |
| Production Range | 170mm |
| Heating Method | Induction Heating |
| Material | Carbon Steel |
|---|---|
| Materials | Epoxy Powder |
| Product Model | 3LPE-PP Coating Production Line |
| Power Supply | 380V/50Hz |
| Pipe Length Range | 6-12 Meters |
| Packaging Details | Standard Package |
|---|---|
| Delivery Time | 45 days |
| Payment Terms | L/C,D/A,D/P,T/T |
| Supply Ability | 50 units/ month |
| Place of Origin | Qingdao, China |
| Condition | New |
|---|---|
| Raw Material | PE80, PE100 |
| Computerized | Computerized |
| Customized | Customized |
| Packaging Details | Standard Export Package |
| Product Type | PE Board |
|---|---|
| Screw No. | Single-screw |
| Computerized | Computerized |
| Basing Tape Max. Width | 1000mm |
| Material For Production | Polyethylene |
| After-sales Service | Installation And Training |
|---|---|
| Usage | District Heat/Chiller Supply |
| Pipe Type | Rigid / Flexible |
| Packaging Details | Standard packaging |
| Delivery Time | 60days |
| PE Thickness | 2-3mm |
|---|---|
| Substrate | Steel |
| Fbe Thickness | 200-800um |
| Packaging Details | Plastic Film and Wooden Pallet |
| Delivery Time | 60DAYS |
| Raw Material | PE80, PE100 |
|---|---|
| Control System | Siemens |
| Calibration Method | Vacuum |
| Packaging Details | Standard Export Package |
| Delivery Time | 60days |
| Mold Type | Spiral Mold |
|---|---|
| Specification | 800.00cm * 220.00cm * 200.00cm |
| After-sales Service | Overseas Installation, Free Technical Supporting |
| Packaging Details | Standard Export Package |
| Delivery Time | 60day |