| Screw No. | Single-screw |
|---|---|
| Raw Material | Pe |
| HDPE Jacket Pipe Color | Can Be Customized |
| Application | Producing Pre-Insulated Pipe |
| Packaging Details | standard packaged |
| Type | Coating Production Line |
|---|---|
| Coating Layer | Internal Fbe And External 3lpe |
| Spray Gun Method | High Voltage Electrostatic Spray Gun |
| Applications | Oil, Natural Gas, And Water Supply Pipelines |
| Packaging Details | Wooden/Plastic Film |
| Automation | Automatic |
|---|---|
| Condition | New |
| Application | Producing Pre-Insulated Pipe Jacket |
| Raw Material | PE |
| Cutting Method | Dust-Free Planetary Cutting |
| Automation | Automatic |
|---|---|
| Condition | New |
| Application | Producing Pre-Insulated Pipe Jacket |
| Packaging Details | Standard Package |
| Delivery Time | 60days |
| Screw No. | Single-screw |
|---|---|
| Computerized | Computerized |
| Sleeve Thickness | 0.5-3mm |
| Part1 | Basic Film Extrusion Line |
| Part2 | Adhesive (EVA) Coating Line |
| Screw No. | Single-screw |
|---|---|
| Computerized | Computerized |
| Sleeve Thickness | 0.5-3mm |
| Part1 | Basic Film Extrusion Line |
| Part2 | Adhesive (EVA) Coating Line |
| Screw | Single-Screw |
|---|---|
| Automation | Automatic |
| Customized | Customized |
| Crawler Lengh | 2.5m Effective Length |
| Crawler Feet | 2-12 Feet |
| Capacity | 250kg/h |
|---|---|
| Extruder Model | SJ90x30 |
| Packaging Details | Container loading,sea transportation |
| Delivery Time | 20-30work days |
| Payment Terms | T/T |
| Pipe Usage | Sdistrict Heat/Chiller Supply |
|---|---|
| Apply To | Pert Flexible Insulation Pipes And Pert Rigid Insulation |
| Foaming Layer | Soft Polyurethane Foam And Rigid Polyurethane Foam |
| Inner Pipe | PE-Xa Or PE-Rt II Material |
| Packaging Details | Standard Packing |
| Screw No. | Single-screw |
|---|---|
| Computerized | Computerized |
| Sleeve Thickness | 0.5-3mm |
| Part1 | Basic Film Extrusion Line |
| Part2 | Adhesive (EVA) Coating Line |