Foaming Method | Spraying |
---|---|
Material | Steel |
Insulation Layer Thickness | 20-100mm |
Control System | PLC |
Foaming Material | Polyurethane |
Condition | New |
---|---|
Material | PE/PUR |
Control System | PLC |
Heating Method | Electric Heating |
Humidity | 85% Non Condensing |
Condition | New |
---|---|
Material | PE/PUR |
Control System | PLC |
Heating Method | Electric Heating |
Humidity | 85% Non Condensing |
PE Thickness | 2-3mm |
---|---|
Substrate | Steel |
Fbe Thickness | 200-800um |
Packaging Details | Plastic Film and Wooden Pallet |
Delivery Time | 60DAYS |
Coating Materials | Polyethylene, Polypropylene |
---|---|
Product Model | 3LPE-PP Coating Production Line |
Heating Method | Induction Heating |
Coating Layers | 3 Layers |
Coating Thickness | 1.5-3mm |
Power Supply | 380V/50Hz |
---|---|
Production Capacity | 1000 Meters Per Day |
Total Power | 150kw |
Insulation Material | Polyurethane Foam |
Pipe Material | Steel |
Location | Indoor |
---|---|
Color | Black |
Power Supply | No Dangerous Area |
Humidity | 85% No Condensation |
Temperature | 0-30℃ |
Application | Produce District Heat Distribution Pipe |
---|---|
Pipe Structure | Steel Working Pipe-Polyurethane Foam-HDPE Casing |
Loading Way | Vacuum Automatic Feeding |
Feeding Capacity | 1000kg/H |
Derusting Load Up Pipe Rack | 20# Channel Steel Double Row |
Application | Produce District Heat Distribution Pipe |
---|---|
Pipe Structure | Steel Working Pipe-Polyurethane Foam-HDPE Casing |
Compressed Air | 6 M3/min >0.5MPa |
Pipe Usage | PU Pre-Insulation |
Total Length | About 110m |
Shot/Grit Separator | 100T |
---|---|
Cyclone Dust Collector | 1m |
Pulse Filter Cartridge Dust Collector | Cylinder |
Spiral Conveyor Line | 32 Filter Cartridge |
Steel Shot/grit Elevator | 100T |