| Coating Materials | Polyethylene, Adhesive, Epoxy |
|---|---|
| Pipe Length Range | 6-12 Meters |
| Material | Carbon Steel |
| Capacity | 1000-2000 Meters Per Day |
| Heating Method | Induction Heating |
| Coating Layers | 3 Layers (FBE, Adhesive, PE) |
|---|---|
| Product Model | 3LPE-PP-1 |
| Pipe Length | 6-12m |
| Material | Steel |
| Materials | Epoxy Powder |
| Screw Diameter | 65MM |
|---|---|
| Maximum Speed Of Screw | 70r/min |
| Feed Roll Diameter | 65MM |
| Motor Power | 22KW |
| Delivery Time | 8 workdays |
| Model | PE-850/1372 |
|---|---|
| Drying Machine | HSD-1200 |
| Calibration Method | Vacuum And Water Cooling |
| Cooling Method | Water Cooling |
| Packaging Details | according to the actual condition |
| Insulation Material | Polyurethane Foam |
|---|---|
| Pipe Diameter Range | 50mm-200mm |
| Cutting Method | Planetary Cutting |
| Overall Dimension | 25m*5m*3m |
| Packaging Details | according to the actual condition |
| Model NO. | 960-1680mm |
|---|---|
| Application | Water Supply, Gas Supply |
| Voltage | 380V 50Hz |
| Customized | Customized |
| Advantages | Excellent Stiffness, Flexibility, High Mechanical |
| Capacity | 250kg/h |
|---|---|
| Extruder Model | SJ90x30 |
| Packaging Details | Container loading,sea transportation |
| Delivery Time | 20-30work days |
| Payment Terms | T/T |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 100set a year |
| Place of Origin | China |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 100set a year |
| Place of Origin | China |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 100set a year |
| Place of Origin | China |