| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 100set a year |
| Place of Origin | China |
| Type | Polyurethane Foam Machine |
|---|---|
| Principle | High-Pressure Air Type |
| Pipe Material | Steel Pipe |
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Extruder | Sj-120/38 |
| Style | Handheld |
|---|---|
| Character | Compact Design, Light In Weight |
| Transport Package | Standard Package |
| HS Code | 846880000 |
| Voltage | 220V 50Hz |
| Warranty | 1 Year |
|---|---|
| Coating Type | 3LPE (Three-Layer Polyethylene) |
| Control System | PLC |
| Power Supply | 380V/50Hz |
| Product Type | Pipe Production Line |
| Warranty | 1 Year |
|---|---|
| Coating Type | 3LPE (Three-Layer Polyethylene) Coating |
| Product Type | Pipe Production Line |
| Material | Steel |
| Heating Method | Induction Heating |
| Material | Steel |
|---|---|
| Type | Coating Production Line |
| Coating | PE |
| 3PE Structure | Epoxy+Adhesive+Extruded Polyethylene |
| Pipe Diameter | 50-4200mm |
| Application Area | Pre-Insulated & Oil Pipe |
|---|---|
| Material | Hdpe |
| Thickness | 2-16mm |
| Connection | Welding |
| Packaging Details | Plastic Film and Wooden Case |
| Application | Produce District Heat Distribution Pipe |
|---|---|
| Screw | Solid-Liquid Separation Screw |
| Setting Box | Vacuum Setting |
| Turkkey Project | Provided |
| Loading Way | Vacuum Automatic Feeding |
| Type | Coating Production Line |
|---|---|
| Coating Structure | Fbe, 2lpe, 3lpe |
| Condition | New |
| Packaging Details | Standard Package for Export |
| Delivery Time | 60Days |
| Coating Type | PE Extrusion Coating |
|---|---|
| Coating Thickness | 1.8-4mm |
| Pipe Cleaning Method | Shot Blasting |
| Heating Method | Induction Heating |
| Cooling Method | Water Cooling |