| Condition | New |
|---|---|
| Color | Custom |
| Specification | PIPE DIAMETER: 960-1680MM |
| Screw | Single Screw |
| Automation | Automatic |
| Application | Producing Pre-Insulated Pipe Jacket |
|---|---|
| Cutting Method | Dust-Free Planetary Cutting |
| Screw No. | Single-screw |
| Computerized | Computerized |
| After-sales Service | Technical Service With Free,Training The Workers |
| Raw Material Density | Above 0.935 |
|---|---|
| Connection | Welding |
| Material | Plastic |
| Usage | Pre-Insulated Pipeline Joints |
| Applications | HDPE Pipeline Joint Closure |
| Application | Producing Pre-Insulated Pipe Jacket |
|---|---|
| Cutting Method | Dust-Free Planetary Cutting |
| After-sales Service | Technical Service With Free,Training The Workers |
| Packaging Details | Standard packaging |
| Delivery Time | 60 days |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 30sets a year |
| Place of Origin | China |
| Total Length | About 110m |
|---|---|
| Coating | Spray Winding |
| Medium Temperature | ≤120°C (incidental Peak Value <140°C) |
| Turkkey Project | Provided |
| Operating System | Touch Screen |
| Product Type | Plastic Pipe |
|---|---|
| Screw | Single-Screw |
| Application | For Producing Pre-Insulated Pipe Jacket |
| Specification | Vacuum Calibration System |
| Assembly Structure | Separate Type Extruder |
| Application | Producing Pre-Insulated Pipe Jacket |
|---|---|
| Cutting Method | Dust-Free Planetary Cutting |
| Screw No. | Single-screw |
| Computerized | Computerized |
| After-sales Service | Technical Service With Free,Training The Workers |
| Condition | New |
|---|---|
| Material | PE/PUR |
| Control System | PLC |
| Heating Method | Electric Heating |
| Humidity | 85% Non Condensing |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 100set a year |
| Place of Origin | China |