| Application | Pipe Production |
|---|---|
| Material | Steel |
| Insulation Material | Polyurethane Foam |
| Control System | PLC Control |
| Max. Working Pressure | 2.5MPa |
| Application | Pipe Production |
|---|---|
| Material | Steel |
| Insulation Material | Polyurethane Foam |
| Control System | PLC Control |
| Max. Working Pressure | 2.5MPa |
| Application | Pipe Production |
|---|---|
| Material | Steel |
| Insulation Material | Polyurethane Foam |
| Control System | PLC Control |
| Max. Working Pressure | 2.5MPa |
| Voltage | 220V/380V |
|---|---|
| Cooling Method | Water Cooling |
| Raw Material | Steel Pipe |
| Warranty | 1 Year |
| Total Power | 120-300kW |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 100set a year |
| Place of Origin | China |
| Packaging Details | Standard packaging |
|---|---|
| Delivery Time | 90 days |
| Payment Terms | T/T |
| Supply Ability | 100set a year |
| Place of Origin | China |
| Application | Supply Hot Water/Oil Delivery/Chemical Material |
|---|---|
| Cyclone Dust Collector | 1m |
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Material | PE/PUR |
| Coating Thickness | 50-100mm |
| Coating Thickness | 50-100mm |
|---|---|
| Capability | 3-4unit/H |
| Voltage | 220V/380V |
| Medium Temperature | ≤120°C (incidental Peak Value <140°C) |
| Spiral Conveyor Line | Solid Tire |
| Production Line Length | 30-50m |
|---|---|
| Extrusion Process | Multi-Layer Extrusion |
| Foaming Thickness | Pre-insualte |
| Insulation Thickness | 20mm-100mm |
| Packaging Details | according to the actual condition |
| Production Line Length | 30-50m |
|---|---|
| Extrusion Process | Multi-Layer Extrusion |
| Foaming Thickness | Pre-insualte |
| Insulation Thickness | 20mm-100mm |
| Packaging Details | according to the actual condition |