| Capability | 3-4unit/H |
|---|---|
| Foaming Thickness | 30-100mm |
| Cleaning Level | SA2.5 |
| Packaging Details | standard Package |
| Delivery Time | 60DAYS |
| Type | Coating Production Line |
|---|---|
| Coating | PE Extrusion |
| Bending Angle | 15-90 Degrees |
| Consists Of | First Fbe Coating, Middle Adhesive,Outer PE Layer |
| Packaging Details | Plastic Film and Wooden Pallet |
| Coating | Spray Winding |
|---|---|
| Certification | ISO |
| Coating Structure | Puf Insulation Layer, PE Outer Casing |
| Specification | 500-1620 |
| Type | Coating Production Line |
| Application | For Producing Pre-Insulated Pipe Jacket |
|---|---|
| Control System | PLC |
| Specification | 960-1680mm |
| Pipeline Material | HDPE |
| Packaging Details | according to the actual condition |
| Insulation Material | Polyurethane Foam |
|---|---|
| Usage | Water/Gas/Oil Supply Pipeline |
| Production Range | Pipe Diameter 110-600mm |
| Drying Machine | HSD-1200 |
| Foaming Thickness | Pre-insualte |
| Produce Capability | 1000-1200kg/H |
|---|---|
| Screw | Solid-Liquid Separation Screw |
| Setting Box | Vacuum Setting |
| Temperature Classification | High Temperature Piping |
| Coating Thickness | 50-100mm |
| Automation | Automatic |
|---|---|
| Certification | CE, QS |
| Condition | New |
| Application | For Producing Pre-Insulated Pipe Jacket |
| Raw Material | PE |
| Raw Material | PE |
|---|---|
| Cutting Method | Dust-Free Planetary Cutting |
| Application | Producing Pre-Insulated Pipe Jacket |
| HS Code | 8477209000 |
| Computerized | Computerized |
| Heating Temperature | 220-250℃ |
|---|---|
| Pe Layer Thickness | 2.5-3.7mm |
| Method Type | Automatic |
| Operating System | Touch Screen |
| Coating Layer | Internal&External Pipe Wall |
| Type | Polyurethane Foam Machine |
|---|---|
| Pipe Structure | Carrier Steel Pipe-Polyurethane Foam-HDPE Casing |
| Rust Removal Quality | ≥2.5 Grade |
| Foaming Thickness | 30-100mm |
| Foaming Machine | High-Pressure Foaming Machine |