| Pipe Material | Steel |
|---|---|
| Color | Black |
| Material | Stainless Steel |
| Drying Machine | HSD-1200 |
| Packaging Details | according to the actual condition |
| Production Line Length | 30-50m |
|---|---|
| Extrusion Process | Multi-Layer Extrusion |
| Foaming Thickness | Pre-insualte |
| Insulation Thickness | 20mm-100mm |
| Packaging Details | according to the actual condition |
| Production Line Length | 30-50m |
|---|---|
| Extrusion Process | Multi-Layer Extrusion |
| Foaming Thickness | Pre-insualte |
| Insulation Thickness | 20mm-100mm |
| Packaging Details | according to the actual condition |
| Cooling Method | Water Cooling |
|---|---|
| Operating System | Touch Screen |
| Power Supply | 380V/50Hz |
| Transmission Type | Rigid |
| Packaging Details | according to the actual condition |
| Production Scope | Product Line |
|---|---|
| Pipe Length | 6-12m |
| Total Power | 180KW |
| Extrusion Process | Multi-Layer Extrusion |
| Packaging Details | according to the actual condition |
| Model | T-250 |
|---|---|
| Extruder Power | 55kw |
| Rhythm | Flow Production Line |
| Diameter Of Screw | Ф75mm |
| Packaging Details | according to the actual condition |
| Pipe Surface Treatment | Shot Blasting, Pickling, Phosphating |
|---|---|
| Dust Removal Fan | Fan Power 5.5kw |
| Operating Mode | Automatic |
| Coating Material | Epoxy Powder Spraying Coating |
| Pipe Surface Preparation | Shot Blasting |
| Pipe Surface Treatment | No Less Than SA2.5 |
|---|---|
| Fbe Thickness | 200-800um |
| HS Code | 8477209000 |
| Packaging Details | Plastic Film and Wooden Pallet |
| Delivery Time | 60days |
| Packaging Details | wodden box |
|---|---|
| Delivery Time | 60-90 days |
| Payment Terms | T/T |
| Supply Ability | 100 sets/year |
| Place of Origin | China |
| After-sales Service | Installation And Training |
|---|---|
| Usage | District Heat/Chiller Supply |
| Pipe Type | Rigid / Flexible |
| Packaging Details | Standard packaging |
| Delivery Time | 60days |