| Application | Producing Pre-Insulated Pipe Jacket | 
|---|---|
| Cutting Method | Dust-Free Planetary Cutting | 
| After-sales Service | Technical Service With Free,Training The Workers | 
| Packaging Details | Standard packaging | 
| Delivery Time | 60 days | 
| Pipe Structure | Puf Insulation Layer, PE Outer Casing | 
|---|---|
| Foaming Machine | High-Pressure Foaming Machine | 
| Foaming Thickness | 30-100mm | 
| Applications | Hot Chiller Water/Oil /Chemical Material Pipeline | 
| Packaging Details | Wodden Box | 
| Plc | Siemens | 
|---|---|
| Production Line Components | Extruder, Foaming Machine, Haul-off Machine, Cutting Machine, Etc. | 
| Production Range | Pipe Diameter 110-600mm | 
| Application | For Producing Pre-Insulated Pipe Jacket | 
| Cutting Device | Planetary Cutter | 
| After-sales Service | Overseas Installation, Free Technical Supporting | 
|---|---|
| Cutting Method | Planeatry Cutting | 
| Transmission Type | Rigid | 
| Computerized | Computerized | 
| Customized | Customized | 
| Application | Pipeline Joint Closure | 
|---|---|
| Connection | Welding | 
| Customized | Customized | 
| Packaging Details | Standard Package | 
| Delivery Time | 60 days | 
| Packaging Details | Standard packaging | 
|---|---|
| Delivery Time | 60-90 days | 
| Payment Terms | T/T,D/A,L/C | 
| Supply Ability | 30 sets a year | 
| Place of Origin | China | 
| Type | Polyurethane Foam Machine | 
|---|---|
| Raw Material | HDPE | 
| Package Size | 1200.00cm * 230.00cm * 260.00cm | 
| Foaming Thickness | 30-100mm | 
| Application | Hot Chiller Water/Oil /Chemical Material Pipeline | 
| Coating | Powder Coating, Extrusion Coating | 
|---|---|
| Substrate | Steel | 
| Coating Structure | Fbe, 2lpe, 3lpe | 
| Heating Method | Induction Heating | 
| HS Code | 8477209000 | 
| Coating | Powder Coating, Extrusion Coating | 
|---|---|
| Coating Type | Internal, External | 
| Coating Material | Epoxy Powder, Adhesive, Polyethylene | 
| Substrate | Steel | 
| Coating Structure | Fbe, 2lpe, 3lpe | 
| Condition | New | 
|---|---|
| Usage | District Heat/Chiller Supply | 
| Working Pipe Material | PERT/PEX/PPR | 
| Packaging Details | Standard Package | 
| Delivery Time | 60Days |