Application Area | Directly Buried Metal Reinforced Corrugated Pipes |
---|---|
Connection | Welding |
Material | HDPE |
Packaging Details | Plastic Film and Wooden Case |
Delivery Time | 60days |
Material | HDPE |
---|---|
Application | Pipeline Joint Closure |
Application Area | Directly Buried Pre-Insulated Pipe |
Packaging Details | Plastic Film and Wooden Case |
Delivery Time | 60days |
Head Type | Round |
---|---|
Application | Insulation Pipe |
Thickness | 2-18mm |
Packaging Details | Standard Package |
Delivery Time | 60days |
Packaging Details | Standard Package |
---|---|
Delivery Time | 45-75 days |
Payment Terms | T/T,D/P,D/A,L/C |
Supply Ability | 50 Units/Month |
Place of Origin | Qingdao, China |
Packaging Details | Standard Package |
---|---|
Delivery Time | 60days |
Payment Terms | L/C,T/T,Western Union,MoneyGram |
Supply Ability | 2000sets/Day |
Place of Origin | Qingdao China |
Application | Hollow Wall Spiral Pipe Connection |
---|---|
Connection Type | Elecro Fusion Welding |
Pipe Range | 200-2600mm |
Tensile Strength/MPa | >19 |
Elongation At Break/% | -35° C>100 |
Application | Hollow Wall Spiral Pipe Connection |
---|---|
Connection Type | Elecro Fusion Welding |
MFR/ (190°,5kg)g/10min | 0.4 〜1 |
Vicat Softening Point/I | >110 |
Elongation At Break/% | -35° C>100 |
Applicationpipeline Joint Closure | Pipeline Joint Closure |
---|---|
Thickness | 2-18mm |
Usage | Weld HDPE Pipe |
Packaging Details | Standard Package |
Delivery Time | 60Days |
Head Type | Round |
---|---|
Usage | Weld HDPE Pipe |
Applicationpipeline Joint Closure | Pipeline Joint Closure |
Packaging Details | Standard Package |
Delivery Time | 60days |
Thickness | 2-18mm |
---|---|
Width | 100-700mm |
Head Type | Round |
Packaging Details | Standard Package |
Delivery Time | 60days |