Линия по удалению ржавчины с наружной поверхности стальных труб #huashida #pipelining #machine

3LPE Coating Pipe Production Line
July 31, 2025
Category Connection: 3LPE Coating Pipe Production Line
Brief: Get a guided demo that shows common workflows and troubleshooting tips. This video provides a detailed walkthrough of the Huashida Blasting Deruster and 3PE Coating Line, demonstrating the complete process for removing rust from steel pipe exteriors and applying protective FBE coatings. You'll see the shot blasting system, dust collection units, and the spiral 3PE production line in action, showcasing how this integrated equipment ensures high-quality corrosion protection for industrial pipelines.
Related Product Features:
  • Integrated shot blasting derusting line effectively removes rust from steel pipe exteriors.
  • Complete 3PE anti-corrosion coating system applies epoxy, adhesive, and polyethylene layers.
  • Advanced dust collection with cyclone and pulse filter cartridge systems maintains clean operation.
  • Intermediate frequency heating system ensures optimal temperature for coating adhesion.
  • Hydraulic elevating pipe turner and grooving devices facilitate smooth material handling.
  • Capable of processing pipe diameters ranging from 48mm to 2400mm for various applications.
  • Produces coating thickness from 80 to 800 micrometers for durable corrosion protection.
  • Designed to meet international standards including SY/T0413-2002, DIN 30670, and American Corrosion Association requirements.
FAQs:
  • What pipe diameter sizes can your equipment handle?
    Our equipment is available in four main models capable of processing steel pipes with diameters ranging from 48-219mm, 219-1220mm, 800-1600mm, and 1000-2400mm.
  • What is the descaling grade achieved by your system?
    The shot blasting derusting system achieves a SA2.5 surface preparation grade, ensuring optimal cleanliness for coating adhesion.
  • What international standards does your anti-corrosion coating meet?
    Our coating lines meet SY/T0413-2002, GB/T23257-2009, German DIN 30670, DIN 30678, American Corrosion Association standards, and DNV requirements.
  • What is the typical delivery time for this equipment?
    Delivery typically takes 2-3 months after deposit confirmation.
  • What is the production output capacity?
    Output varies by pipe diameter, with maximum capacity of 3-8 km per day and annual processing capacity of 2 million square meters for Φ508mm pipes.